Tender Details
About Tender
🚂 Procurement Opportunity: Bottom And Side Rubber Packing 📦 The Ministry Of Railways, Central Government, Invites Tenders For The Supply Of Bottom And Side Rubber Packing. 🛠️ Tender Submission Deadline: May 03, 2024, 1:30 Pm Interested Bidders Are Advised To Review The Complete Tender Document For Detailed Specifications, Terms, And Conditions. Keywords: Bottom And Side Rubber Packing, Ministry Of Railways, Tender, Central Government, Procurement, Rubber ProductsParticulars | Details |
---|---|
Title |
Bottom And Side Rubber Packing
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106314374 |
Reference Number |
10231556 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/052024/106314374/viewNitPdf_4534413.pdf |
Start Date | April 10, 2024 16:32 |
End Date |
03/05/2024 ( Expired 393 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Integrated development of chandrika and gs49 project
Offshore installation and onshore works of 
 integrated development of chandrika and gs49 project
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreDesign and construction of grade separator
Design construction of 
 grade separators at perungudi junction and srp tools junction
 including service road, electrical, drainage and misc works
Read moreRfp for engagement of firms for marketing operation and maintenance primary processing facility at karnal
Rfp for engagement of firms for marketing operation and maintenance of cold storage facilities and storage facility for fruits vegetables and grains at the food and processing centre at karnal haryana lump sum annual amount to be quoted by the bidder
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreRfp for engagement of firms for marketing operation and maintenance of cold storage facilities and storage facility for fruits vegetables and grains at the food and agro processing centre at panipat
Rfp for engagement of firms for marketing, operation and maintenance of cold storage facilities and storage facility for fruits, vegetables and grains at the food and agro processing centre at panipat haryana lump sum annual amount to be quoted by
Read moreJp/b933-011-mc-t-7401/1010 cdu heater (new) and vdu heater (revamp) package of bina petchem and refinery expansion project(bprep)
Cdu heater (new) and vdu heater (revamp) package of bina petchem and refinery expansion project(bprep)
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreof your Industry type