Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacing Of Granite Stone In Porch Of New Campus At Cari, Izatnagar
|
| Description |
Replacing Of Granite Stone In Porch Of New Campus At Cari, Izatnagar
|
| Organisation | Department of Agricultural Research and Education | Central Govt. Ministry/Department |
| Tender Id | 2024_DARE_819703_1 |
|
Reference Number |
CARI/GC/4-20/2024-25 |
| Tender Fee | 0 |
| EMD | 5500 |
| Tender Value | - |
| Place | ICAR-CARI, Izatnagar |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=871498 |
| Start Date | October 06, 2024 15:30 |
| End Date |
Expired
14/10/2024
Expired 733 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Granite stone,gi earthing strip,three phase meter,singal phase meter,ss plate of size 90cmx50cm
Granite stone,gi earthing strip,three phase meter,singal phase meter,ss plate of size 90cmx50cm
Read moreCobble stone,prefabricated welcome gate,boundary fence,rcc u drain,granite flooring,prefabricated green tunnel,prefabricated arc bridge,prefabricated viewing deck
Cobble stone,prefabricated welcome gate,boundary fence,rcc u drain,granite flooring,prefabricated green tunnel,prefabricated arc bridge,prefabricated viewing deck
Read moreReplacing the existing damaged facade glass with new glass panels at csb central staircase in iiser campus, vithura
Replacing the existing damaged facade glass with new glass panels at csb central staircase in iiser campus, vithura
Read moreSupply and fixing of paver block and kerb stone material at nanaji deshmukh veterinary science university, adhartal jabalpur campus
Supply and fixing of paver block and kerb stone material at nanaji deshmukh veterinary science university, adhartal jabalpur campus
Read moreProvision for granite stone and aluminum cupboard in room no. 113, pvc wall paneling and false ceiling in room no. 345 and const. of store room in uiet at kuk.( only societies can bid)
Provision for granite stone and aluminum cupboard in room no. 113, pvc wall paneling and false ceiling in room no. 345 and const. of store room in uiet at kuk.( only societies can bid)
Read moreUpgradation of ground floor in rcrqa by way of kota stone flooring under nutritional and functional food analysis laboratory at main campus shalimar, skuast-k.
Upgradation of ground floor in rcrqa by way of kota stone flooring under nutritional and functional food analysis laboratory at main campus shalimar, skuast-k.
Read moreProvn of toilet block at 60 coy asc/ncc dte , provn of iron grill/bars with bricks wks near parade grd of aoc cent and upgradation of slab in kitchen from kadapa stone to granite slab connected items in resi qtr at dgqa under br (s) iiof ge(s)secbad
Provn of toilet block at 60 coy asc/ncc dte , provn of iron grill/bars with bricks wks near parade grd of aoc cent and upgradation of slab in kitchen from kadapa stone to granite slab connected items in resi qtr at dgqa under br (s) iiof ge(s)secbad
Read more2k pu th,2k pu exterior wood glossy,2k pu sealer base,exterior emultion paint weather coat,rubberized water proof tape,galvanized iron plain sheet,elasto multiseal liquid rubber,galvanlzed iron corrugated sheet,granite stone,distemper white,distemper cresent,countersunk head stain less 0.75 inch,countersunk head stain less 1 inch,countersunk head stain less 1.5 inch,countersunk head stain less 2.5 inch,boulder stone,coarse sand,roofing sheet screw,roofing sheet screw
2k pu th,2k pu exterior wood glossy,2k pu sealer base,exterior emultion paint weather coat,rubberized water proof tape,galvanized iron plain sheet,elasto multiseal liquid rubber,galvanlzed iron corrugated sheet,granite stone,distemper white,distemper cresent,countersunk head stain less 0.75 inch,countersunk head stain less 1 inch,countersunk head stain less 1.5 inch,countersunk head stain less 2.5 inch,boulder stone,coarse sand,roofing sheet screw,roofing sheet screw
Read moreWpc solid door or window frames,wpc solid laminated board 24 mm thick,stainless steel hinges 100 mm bright finish,pvc nahani trap 110 mm plain with grating,stainless steel continuous piano hinges 40 mm width,granite stone flooring 18 mm thick mirror polished,pre-painted galvalume gi corrugated steel sheet zero point zero five mm thick,plain polycarbonate multiwall roof sheets 10 mm thick uv coated,insulation board false ceiling 10 mm thick 600 into 600 mm,cp brass stop cock concealed,kota stone window cill 20 to 25 mm thick,extra for kota stone oblique sandstone window cill single length up to 2 m,extra for pre finished nosing in kota stone oblique sandstone window cill
Wpc solid door or window frames,wpc solid laminated board 24 mm thick,stainless steel hinges 100 mm bright finish,pvc nahani trap 110 mm plain with grating,stainless steel continuous piano hinges 40 mm width,granite stone flooring 18 mm thick mirror polished,pre-painted galvalume gi corrugated steel sheet zero point zero five mm thick,plain polycarbonate multiwall roof sheets 10 mm thick uv coated,insulation board false ceiling 10 mm thick 600 into 600 mm,cp brass stop cock concealed,kota stone window cill 20 to 25 mm thick,extra for kota stone oblique sandstone window cill single length up to 2 m,extra for pre finished nosing in kota stone oblique sandstone window cill
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type