Particulars | Details |
---|---|
Title |
For Wiring Configuration And Testing Work Of 220k V Bus Bar Protection Panel (Ziv Make) Installed At 220k V S/Stn Hvpnl Kaithal
|
Description |
For Wiring Configuration And Testing Work Of 220k V Bus Bar Protection Panel (Ziv Make) Installed At 220k V S/Stn Hvpnl Kaithal
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2024_HBC_408758_1 |
Reference Number |
12/GE-50/2024-25 Dated 05-11-2024 |
Tender Fee | 2360 |
EMD | 16900 |
Tender Value | |
Place | 220KV S/Stn Kaithal |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=485270 |
Start Date | November 05, 2024 20:30 |
End Date |
13/11/2024 ( Expired 228 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Substation package ss-01 (i) 1 no. 220kv line bay at bikaner-iii ps for interconnection of 300mw regs of m-s deshraj solar energy pvt. ltd. (dsepl). (ii) 1 no. of 400 kv line bay at 765/400/220 kv bikaner-iii ps for interconnection of 1000mw rppd of m-s mrs buildvision pvt. ltd. (mbpl) and 400 kv bus extension work
765/400/220 kv ais extension package - substation package ss-01 (i) 1 no. 220kv line bay at bikaner-iii ps for interconnection of 300mw regs of m-s deshraj solar energy pvt. ltd. (dsepl). (ii) 1 no. of 400 kv line bay at 765/400/220 kv bikaner-iii ps for interconnection of 1000mw rppd of m-s mrs buildvision pvt. ltd. (mbpl) and 400 kv bus extension work
Read moreWork of providing and fixing of lighting materials for lighting arrangement and other associated work at 132 kv s/s deoria under etd, deoria
Work of providing and fixing of lighting materials for lighting arrangement and other associated work at 132 kv s/s deoria under etd, deoria
Read moreManufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss
Manufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss
Read moreEpc services - supply, installation, testing and commissioning (sitc) of external electrification infrastructure for e-bus charging at dewas naka aictsl depot (niranjanpur)under pm e-bus seva
Epc services - supply, installation, testing and commissioning (sitc) of external electrification infrastructure for e-bus charging at dewas naka aictsl depot (niranjanpur)under pm e-bus seva
Read moreEpc services - supply, installation, testing and commissioning (sitc) of external electrification infrastructure for e-bus charging at nayta mundla under pm e-bus seva
Epc services - supply, installation, testing and commissioning (sitc) of external electrification infrastructure for e-bus charging at nayta mundla under pm e-bus seva
Read moreWork of providing and fixing of 2x400 watt high mast light fitting and 2x100 watt aviation light for lighting arrangement at 220 kv s/s katrari, deoria under etd, deoria
Work of providing and fixing of 2x400 watt high mast light fitting and 2x100 watt aviation light for lighting arrangement at 220 kv s/s katrari, deoria under etd, deoria
Read moreProcurement of spares for chicago make air compressor model hn2t 180lp and hx2t 60 np installed at dfah system at ggsstp, rupnagar.
Procurement of spares for chicago make air compressor model hn2t 180lp and hx2t 60 np installed at dfah system at ggsstp, rupnagar.
Read moreSupply, installation, testing and commissioning of vrv/vrf air-conditioning work for fun science gallery at 2nd floor of national science centre, delhi
Supply, installation, testing and commissioning of vrv/vrf air-conditioning work for fun science gallery at 2nd floor of national science centre, delhi
Read moreConstruction of l.t. panel room, meter room and development of balance yard for electric bus at depot workshop gorakhpur
Construction of l.t. panel room, meter room and development of balance yard for electric bus at depot workshop gorakhpur
Read moreConstruction of two storied inspection bungalow with provision of vertical extension of one additional floor (3 story) and allied work at bolpur 132 kv s/stn, under birbhum area office
Construction of two storied inspection bungalow with provision of vertical extension of one additional floor (3 story) and allied work at bolpur 132 kv s/stn, under birbhum area office
Read moreof your Industry type