Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Periodical Renewal Of Pmgsy Handed Over Road Saikar(nec Road) To Upper Saikar(l 030) Of Length 1.522 Km During The Year 2024 25
|
| Description |
Metalling,Carpeting,Sandseal Coat Etc.
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_52884_1 |
|
Reference Number |
32/DNIT/SE-V/AMB/2024-25 |
| Tender Fee | 1000 |
| EMD | 1.14 Lakh |
| Tender Value | |
| Place | Kamalpur |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=53737 |
| Start Date | September 14, 2024 17:30 |
| End Date |
Expired
20/09/2024
Expired 636 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Read moreConstruction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Read moreStrengthening and renewal work of road from gulpada to jurhera via amrooka km 0/00 to 13/00
Strengthening and renewal work of road from gulpada to jurhera via amrooka km 0/00 to 13/00
Read moreStrengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp
Strengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreRehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads
Rehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads.
Read moreRestoration of rain damages on kandu panjoh ( upper) road km. 0/0 to 3/560(sh construction of pcc retaining wall with pusta at rd 0/910 to 0/925)
Restoration of rain damages on kandu panjoh ( upper) road km. 0/0 to 3/560(sh construction of pcc retaining wall with pusta at rd 0/910 to 0/925)
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of road from pwd road to bagiriaguda under mmsy-trip in the district of malkangir for the year 2025-26.
Construction of road from pwd road to bagiriaguda under mmsy-trip in the district of malkangir for the year 2025-26.
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreof your Industry type