Tender Details

Particulars Details
Title
Civil Works Incl Earthwork For Railway Formation,Blanketing Work,Mb, Ru Bs,Sb,Other Service Buildings, Staff Quarters, Platform Works Incl General Electrical Works Between..Single Line Incl Double Track Between..In Chhattisgarh Over Secr
Description
Civil Works Incl Earthwork For Railway Formation,Blanketing Work,Mb, Ru Bs,Sb,Other Service Buildings, Staff Quarters, Platform Works Incl General Electrical Works Between..Single Line Incl Double Track Between..In Chhattisgarh Over Secr
Organisation IRCON International Limited | Public Sector Undertakings
Tender Id 2024_IRCON_184909_1
Reference
Number
IRCON/2059/CGRP/23 24/Urga Dharamjaigarh 1A (R)
Tender Fee 50000
EMD 77.94 Lakh
Tender Value -
Place Bilaspur, Chhattisgarh
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=202423

Start Date February 21, 2024 14:30
End Date
Expired 27/02/2024

Expired 961 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Balance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.

Balance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.

Read more
Balance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.

Balance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.

Read more
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl

Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl

Read more
Engineering procurement and construction (epc) for construction of new line work between including earth work, blanketing, minor bridges, major bridges, robs, lhs/rubs, track works, platform work, station building, fobs, other buildings and associated miscellaneous civil engineering works for 25t indian railway standard loading from bikramshila (incl) to katareah (incl) from ch. 0.50 km to 24.274 km with shivnarayanpur to shivnarayanpur y-link from ch. km 1.10 to 2.933 km and katareah y-

Engineering procurement and construction (epc) for construction of new line work between including earth work, blanketing, minor bridges, major bridges, robs, lhs/rubs, track works, platform work, station building, fobs, other buildings and associated miscellaneous civil engineering works for 25t indian railway standard loading from bikramshila (incl) to katareah (incl) from ch. 0.50 km to 24.274 km with shivnarayanpur to shivnarayanpur y-link from ch. km 1.10 to 2.933 km and katareah y-

Read more
Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast

Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast

Read more
Engineering procurement and construction (epc) for construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 2

Engineering procurement and construction (epc) for construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 2

Read more
South central railway - construction organisation : secunderabad divison : secunderabad - wadi section : #sw1: execution of earth work in embankment & cutting, blanketing to rdso standards, construction of minor bridges & road under bridges (rubs), construction of station & service buildings, approach roads/circulating area, high level platforms, drains and execution of miscellaneous civil works in connection with new 3rd & 4th lines between hafizpet - sanathnagar stations from

South central railway - construction organisation : secunderabad divison : secunderabad - wadi section : #sw1: execution of earth work in embankment & cutting, blanketing to rdso standards, construction of minor bridges & road under bridges (rubs), construction of station & service buildings, approach roads/circulating area, high level platforms, drains and execution of miscellaneous civil works in connection with new 3rd & 4th lines between hafizpet - sanathnagar stations from

Read more
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.

Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.

Read more
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Read more
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise