Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Different Lt Motors Under Emiph Department Stage I And Ii Sgtpp Wbpdcl
|
Description |
Procurement Of Different Lt Motors Under Emiph Department Stage I And Ii Sgtpp Wbpdcl
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id | 2025_WBPDC_815933_1 |
Reference Number |
WBPDCL/SGTPP/NIT/E3298/24-25 |
Tender Fee | 0 |
EMD | 47643 |
Tender Value | |
Place | SAGARDIGHI THERMAL POWER PROJECT |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1849178 |
Start Date | March 24, 2025 14:30 |
End Date |
23/04/2025 ( Expired 16 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreProvision of bldg for processing cum testing facility and laser abalation resistive coatings at defence laboratory jodhpur under age (i) rnd jodhpur
Provision of bldg for processing cum testing facility and laser abalation resistive coatings at defence laboratory jodhpur under age (i) rnd jodhpur
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreRehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar
Rehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar
Read morePackage-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Read moreConstruction of wbm road over dyke top and ramp of the ash pond at sgtpp, wbpdcl.
Construction of wbm road over dyke top and ramp of the ash pond at sgtpp, wbpdcl.
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreof your Industry type