Tender Details
Particulars | Details |
---|---|
Title |
Thanjavur District Package No.04 Strengthening And 5 Years Maintenance Of 3 Road Works In Sethubavachatram Block Under Mgsmt 25 Percent Component 2022 2023.
|
Description |
Thanjavur District Package No.04 Strengthening And 5 Years Maintenance Of 3 Road Works In Sethubavachatram Block Under Mgsmt 25 Percent Component 2022 2023.
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_RDTN_359715_1 |
Reference Number |
DIPR/4358/Tender/2023 dated.08.08.2023 |
Tender Fee | 0 |
EMD | 76400 |
Tender Value | |
Place | DRDA Office, 2nd Floor, New Collectorate, Thanjavu |
Link | https://tntenders.gov.in |
Start Date | August 15, 2023 21:30 |
End Date |
29/08/2023 ( Expired 654 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreUnder the crif (honble cm announcement no. 265/2022), the work of strengthening of mori netwar sankari jakhol motor road (state highway no. 48) of mori development block of uttarkashi district through hotmix/fdr technology.
Under the crif (honble cm announcement no. 265/2022), the work of strengthening of mori netwar sankari jakhol motor road (state highway no. 48) of mori development block of uttarkashi district through hotmix/fdr technology.
Read moreUnder crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.
Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.
Read moreConstruction of kc drain, road protection work and road signage and strengthening by dbm, bc in khatima-melaghat (state road no. 107) under central road and infrastructure fund
Construction of kc drain, road protection work and road signage and strengthening by dbm, bc in khatima-melaghat (state road no. 107) under central road and infrastructure fund
Read moreStrengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039
Read moreImprovement such as widening and strengthening of rayagada-kerada road (mdr-48b) from 0/000 km to 25/166 km in the district of rayagada under state plan
Improvement such as widening and strengthening of rayagada-kerada road (mdr-48b) from 0/000 km to 25/166 km in the district of rayagada under state plan
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreSpecial repair programme 2022-23,2023-24 and 2024-25 of various link road (07 no. roads) m.c. rayya including 5 year maintenance (one year dlp) in district amritsar group no.2
Special repair programme 2022-23,2023-24 and 2024-25 of various link road (07 no. roads) m.c. rayya including 5 year maintenance (one year dlp) in district amritsar group no.2
Read moreConstruction and 5 year maintenance works of district deoria under fdr group upfdr- 215
Construction and 5 year maintenance works of district deoria under fdr group upfdr- 215
Read moreof your Industry type