Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Bypass To Madurai Achambathu Viratipathu In Between Km 6/850 To 10/382 Of Nh 49 Extn. (New Nh 85) Including Land Acquisition On Engineering, Procurement And Construction (Epc) Basis Contract In The State Of Tamil Nadu.
|
| Description |
Construction Of Bypass To Madurai Achambathu Viratipathu In Between Km 6/850 To 10/382 Of Nh 49 Extn. (New Nh 85) Including Land Acquisition On Engineering, Procurement And Construction (Epc) Basis Contract In The State Of Tamil Nadu.
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_762850_1 |
|
Reference Number |
TN No 05/HDO/NH/2023/Dt 20.07.2023 |
| Tender Fee | 23600 |
| EMD | 1.13 Crore |
| Tender Value | - |
| Place | O/o Chief Engineer (NH)Chennai or VC mode |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 20, 2023 22:30 |
| End Date |
Expired
05/09/2023
Expired 1138 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Read moreConstruction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Read moreConstruction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
Construction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode
Read moreConstruction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode under nh o annual plan 2023 24
Construction of bypass to the holenarasipura town from km 87.280 near chikknahalli to km 97.580 near hullahalli on nh 373 in the state of karnataka on epc mode under nh o annual plan 2023 24
Read moreConstruction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Construction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Read moreConstruction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.
Construction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.
Read moreConstruction of service road from ch 312.750 to 314.800 lhs and from ch 313.000 to 314.800 rhs near urla village on existing durg bypass nh-53 (old nh-06) in the state of chhattisgarh on engineering procurement and construction (epc) mode.
Construction of service road from ch 312.750 to 314.800 lhs and from ch 313.000 to 314.800 rhs near urla village on existing durg bypass nh-53 (old nh-06) in the state of chhattisgarh on engineering procurement and construction (epc) mode.
Read moreConstruction of 1 flyover at palbani,1 pup at kuchai,1 pup at samsanghat on jharpokharia balasore section of nh 18 and 1 vup at manda on baharagora singhara of nh 49 in the state of odisha on epc mode
Construction of 1 flyover at palbani,1 pup at kuchai,1 pup at samsanghat on jharpokharia balasore section of nh 18 and 1 vup at manda on baharagora singhara of nh 49 in the state of odisha on epc mode
Read moreof your Industry type