Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Old Damaged Outlet Gate With Butterfly Valve On Dhom Balkawadi Right Bank Canal Km 68.100 To 99.085 For Direct Outlet, Minor Distributary And Escape Gate And Allied Work
|
Description |
Replacement Of Old Damaged Outlet Gate With Butterfly Valve On Dhom Balkawadi Right Bank Canal Km 68.100 To 99.085 For Direct Outlet, Minor Distributary And Escape Gate And Allied Work
|
Organisation | CE (Mechanical) Water Resource Department Nashik | State Govt. and UT |
Tender Id | 2024_WRDMN_1101952_1 |
Reference Number |
etender notice no 4 yr 2024-2025 |
Tender Fee | 2860 |
EMD | 61000 |
Tender Value | |
Place | satara |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1924369 |
Start Date | October 04, 2024 14:30 |
End Date |
11/10/2024 ( Expired 219 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreVertical extension of the existing building (including sanitary and plumbing) and allied works along with additional work adjacent to main gate for centre for laboratory animal research and training (clart),buddha park,kalyani,nadia under wbldcl
Vertical extension of the existing building (including sanitary and plumbing) and allied works along with additional work adjacent to main gate for centre for laboratory animal research and training (clart),buddha park,kalyani,nadia under wbldcl
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for kesla fp at km 198.967 for the work of rehabilitation and up-gradation of nh-200 from design ch.178.944 to 241.533 to 2-lane with paved shoulder in chhattisgarh
Engagement of user fee collection agency on the basis of cb through e-tender for kesla fp at km 198.967 for the work of rehabilitation and up-gradation of nh-200 from design ch.178.944 to 241.533 to 2-lane with paved shoulder in chhattisgarh
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreFor the work of repair of head regulator gate of seoni distributary canal r.d. 0.00 km to 13.50 km. of left bank canal of r.a.b.l.s project.
For the work of repair of head regulator gate of seoni distributary canal r.d. 0.00 km to 13.50 km. of left bank canal of r.a.b.l.s project.
Read moreFor the work of repair of head and cross regulator gate of sadumar branch canal r.d. 0.00 km to 20.910 km. of left bank canal of r.a.b.l.s project
For the work of repair of head and cross regulator gate of sadumar branch canal r.d. 0.00 km to 20.910 km. of left bank canal of r.a.b.l.s project
Read moreof your Industry type