Tender Details
Particulars | Details |
---|---|
Title |
Providing Mazdoor Through Outsourcing Agency For Irrigation Management Of Dhom Balkawadi Right Canal 42 To147 Km Under Dhom Balkawadi Irrigation Sub Division No.2
|
Description |
Providing Mazdoor Through Outsourcing Agency For Irrigation Management Of Dhom Balkawadi Right Canal 42 To147 Km Under Dhom Balkawadi Irrigation Sub Division No.2
|
Organisation | CE-Water Resources Dept. Pune | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1680 |
EMD | 9000 |
Tender Value | |
Place | Satara |
Link |
AAAAAAAAAA Login to view |
Start Date | May 05, 2025 16:30 |
End Date |
13/05/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreConstruction of distribution system for 4924.04 ha. of cca including command area development (cad) of salandi left main canal from rd 49.810 km to 59.970 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 4924.04 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 49.810 km to 59.970 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreM/r to regulator gate and structure including canal banks in connection with kharif irrigation 2024 from ch.1300 to ch. 1392 of mdbc under eroali (i) section of kuli irrigation sub-divn. under m.n.c division during the period july 2025 to oct 2025
M/r to regulator gate and structure including canal banks in connection with kharif irrigation 2024 from ch.1300 to ch. 1392 of mdbc under eroali (i) section of kuli irrigation sub-divn. under m.n.c division during the period july 2025 to oct 2025
Read moreWadi shewadi medium project tal shindkheda dist dhule pipe distribution networks system for gravity main and sub mains of dy no 04 on right bank canal at 7830 m including operation and maintenance of an entire system for five years
Wadi shewadi medium project tal shindkheda dist dhule pipe distribution networks system for gravity main and sub mains of dy no 04 on right bank canal at 7830 m including operation and maintenance of an entire system for five years
Read moreFdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Read moreUpgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Upgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Read moreBifurcation of water supply scheme for village majri jattan (2 no.) covered under existing dargahshah khalid (3 no.) block rupnagar, district rupnagar providing a installing tube well, ohsr, pumping main (rising main), distribution network, chlorinat
Bifurcation of water supply scheme for village majri jattan (2 no.) covered under dargahshah khalid (3 no.) block rupnagar, district rupnagar providing and installing tube well, ohsr, pumping main (rising main), distribution network, nabard xxx
Read moreArc for work of construction and commissioning of 200 mm dia tw with pljt of pipe line with 2 years of dlp under sub division virat nagar under jurisdiction of ee phed paota district kotputli-behror
Arc for work of construction and commissioning of 200 mm dia tw with pljt of pipe line with 2 years of dlp under sub division virat nagar under jurisdiction of ee phed paota district kotputli-behror
Read moreHiring of 01 no. inspection vehicle (diesel car/jeep of ex. room price upto rs. 6.50 lacs) for handpumps , water supply schemes and other govt. works in rural areas under sub division-sohagpur for one year
Hiring of 01 no. inspection vehicle&#x0d (diesel car/jeep of ex. room price upto rs. 6.50 lacs) for handpumps , water supply schemes and other govt. works in rural areas under sub division-sohagpur for one year&#x0d
Read moreof your Industry type