Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cc Block Sadak Construction Work Partaram Godara To Sundarlal, Lunkaransar
|
| Description |
Cc Block Sadak Construction Work Partaram Godara To Sundarlal, Lunkaransar
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_PRD_359277_10 |
|
Reference Number |
417/2023/LKSR |
| Tender Fee | 500 |
| EMD | 20000 |
| Tender Value | |
| Place | as per tender document |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | August 18, 2023 23:30 |
| End Date |
Expired
24/08/2023
Expired 1061 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening of local nallah for flood protection work village relgaon block sultanpur tehsil digod district kota
Widening of local nallah for flood protection work village relgaon block sultanpur tehsil digod district kota
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read morePatch repair work on dlp road kachawa sewadara shahpura road 0/00 to 11/00 under sub dn. nechhawa
Patch repair work on dlp road kachawa sewadara shahpura road 0/00 to 11/00 under sub dn. nechhawa
Read moreTiruppur city municipal corporation_outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type