| Particulars | Details |
|---|---|
| Title |
1(one) Survey Off Eimco Make Sdl Machine No 1750 Dismantling At No 8 Pit Underground 1 L 8 Dr Rvii Seam Site And Transporting The Same Sdl Materials From 1 L 8 Dr To Pit Bottom And Lifting Up To Pit Top And Lowering The Same Up To Surface No 8 Pit
|
| Description |
1(one) Survey Off Eimco Make Sdl Machine No 1750 Dismantling At No 8 Pit Underground 1 L 8 Dr Rvii Seam Site And Transporting The Same Sdl Materials From 1 L 8 Dr To Pit Bottom And Lifting Up To Pit Top And Lowering The Same Up To Surface No 8 Pit
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_310156_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/24-25/EnM/43 Dt 10.06.2024 |
| Tender Fee | 0 |
| EMD | 1800 |
| Tender Value | - |
| Place | Bankola Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321373 |
| Start Date | June 10, 2024 23:30 |
| End Date |
Expired
20/06/2024
Expired 851 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Establishment of track lines for transporting of materials at inter mediate sum area in rvii seam at shyamsundarpur colliery.
Establishment of track lines for transporting of materials at inter mediate sum area in rvii seam at shyamsundarpur colliery.
Read moreOverhauling lifting of 150hp direct haulage from rvii seam to surface, and lowering transporting of the same at 12l and 19d rvii seam of tilaboni colliery.
Overhauling lifting of 150hp direct haulage from rvii seam to surface, and lowering transporting of the same at 12l and 19d rvii seam of tilaboni colliery.
Read moreDismantling, lowering, transporting and again fitting of eimco elecon make sdl machine model -625, sl.no. -1896 at kalidaspur project
Dismantling, lowering, transporting and again fitting of eimco elecon make sdl machine model -625, sl.no. -1896 at kalidaspur project
Read moreDismantling ,transporting and lifting of eimco elecon make sdl no. 810 and beml make sdl no 10045 laying at rviia seam of no 2 pit tilaboni unit and no 3 pit old sspur unit tilaboni colliery
Dismantling ,transporting and lifting of eimco elecon make sdl no. 810 and beml make sdl no 10045 laying at rviia seam of no 2 pit tilaboni unit and no 3 pit old sspur unit tilaboni colliery
Read moreDismantling, loading, lowering, transporting, fitting and commissioning of eimco elecon make sdl 625-1933 and 1894 of porascole east colliery, kajora area
Dismantling, loading, lowering, transporting, fitting and commissioning of eimco elecon make sdl 625-1933 and 1894 of porascole east colliery, kajora area
Read moreDismantling and lifting of eimco sdl m/c 1829 from pit no. 2 (rviia seam) to store of tilaboni colliery
Dismantling and lifting of eimco sdl m/c 1829 from pit no. 2 (rviia seam) to store of tilaboni colliery
Read moreTransporting from bankola colliery lowering through shaft transporting and fitting and assembling of 11 36 sdl at rviib seam of kumardihi a colliery under bankola area
Transporting from bankola colliery lowering through shaft transporting and fitting and assembling of 11 36 sdl at rviib seam of kumardihi a colliery under bankola area
Read more2(two) nos tsu(315kva, 3.3kv 550v) dismantling and transporting/shifting from 3-4d -1l to pit bottom and lifting at surface for repairing the same and after repairing again the repaired tsu lowering, transporting shifting and assembling at 3-4d -1l(u
2(two) nos tsu(315kva, 3.3kv 550v) dismantling and transporting/shifting from 3-4d -1l to pit bottom and lifting at surface for repairing the same and after repairing again the repaired tsu lowering, transporting shifting and assembling at 3-4d -1l(u
Read moreCarrying transporting with fitting 800 mm width 50 meter conveyor structure and changing of 90 meter belt from 3l rvii seam to pit bottom of pit 3 then transporting up to surface and lowering in pit no 2 and then transporting up to tripler belt at ja
Carrying transporting with fitting 800 mm width 50 meter conveyor structure and changing of 90 meter belt from 3l rvii seam to pit bottom of pit 3 then transporting up to surface and lowering in pit no 2 and then transporting up to tripler belt at ja
Read moreDismantling, loading, lowering, transportation, fitting and commissioning of eimco elecon make sdl 625 1865 and sdl 625 1899 of jambad colliery
Dismantling, loading, lowering, transportation, fitting and commissioning of eimco elecon make sdl 625 1865 and sdl 625 1899 of jambad colliery