Tender Details

About Tender

🏭 Procurement Bid: Overhauling And Transportation Of Direct Haulage Equipment 🚜🔧 Eastern Coalfields Limited (Ecil), A Public Sector Undertaking, Is Seeking Bids For The Overhauling Of A 150 Hp Direct Haulage Machine From The Rvii Seam To The Surface, As Well As For The Lowering Of The Same Equipment At The 12 L And 19 D Rvii Seam Of Tilaboni Colliery. 📅 Bid Submission Deadline: May 30, 2024, 6:00 Pm A Tender Fee Of Inr 9000 Has Been Set, With An Earnest Money Deposit (Emd) Of Inr 9000. Interested Bidders Must Possess The Necessary Technical Expertise And Experience In Handling Heavy Machinery In Mining Operations. Proposals Should Detail The Methodology, Equipment, Manpower, And Timelines For The Overhauling And Transportation Processes, Ensuring Compliance With Safety And Environmental Regulations. Keywords: Overhauling, Direct Haulage, 150 Hp, Tilaboni Colliery, Eastern Coalfields Limited, Public Sector Undertaking, Heavy Machinery, Mining Operations, Transportation, Procurement Bid
Particulars Details
Title
Overhauling Lifting Of 150 Hp Direct Haulage From Rvii Seam To Surface, And Lowering Transporting Of The Same At 12 L And 19 D Rvii Seam Of Tilaboni Colliery.
Description
Overhauling Lifting Of 150 Hp Direct Haulage From Rvii Seam To Surface, And Lowering Transporting Of The Same At 12 L And 19 D Rvii Seam Of Tilaboni Colliery.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_308598_1
Reference
Number
ECL/GM/BA/E TENDER/24-25/EnM/18 Dt 20.05.2024
Tender Fee 0
EMD 9000
Tender Value
Place Tilaboni Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319764
Start Date May 20, 2024 23:30
End Date

30/05/2024 ( Expired 389 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Ttps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul

Ttps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul

Read more
Transportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam

Transportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam

Read more
Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section

Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section

Read more
Gear box base jamming work at 22 l and 3 dip 1st belt of seam v and installation of one 1000 mm double drive at 4l/ 1 dip (seam iv b) to divide existing surface belt into two belts of jhilimili mine.

Gear box base jamming work at 22 l and 3 dip 1st belt of seam v and installation of one 1000 mm double drive at 4l/ 1 dip (seam iv b) to divide existing surface belt into two belts of jhilimili mine.

Read more
Annual work of sweeping and cleaning in all type of drtain,common roads and work of daily door to door collection of garbage etc. from residential quarters situated in colony premises at atps chachai.

Annual work of sweeping and cleaning in all type of drtain,common roads and work of daily door to door collection of garbage etc. from residential quarters situated in colony premises at atps chachai.

Read more
A.transportation of 01 no. of defunct tg-unit-3, 02 nos. of old, obsolete tr, it accessories after dismantling from powerhouse to hydro museum premises near forebay tank and re-assembling the same and carrying out other necessary works at shp.

A.transportation of 01 no. of defunct tg-unit-3, 02 nos. of old, obsolete tr, it accessories after dismantling from powerhouse to hydro museum premises near forebay tank and re-assembling the same and carrying out other necessary works at shp.

Read more
Desiltation of sand from annaram downstream

De-siltation of sand 3,55,366 mt from annaram downstream sand reach at jayashankar bhupalpally district in downstream adjacent to saraswathi barrage over cc blocks launching apron area and in stilling section to 104.500 m at annaram village of mahadevpur mandal, jayashankar bhupalpally district and transport same quantity of sand to nearby stockyard (bidder has to identify stock yard near to motorable road) and again loading of sand into the lorries at stockyard.

Read more
Providing and supplying manpower for solid waste operation(collection of waste generated from house to house collecting, lifting and transporting upto dumping yard) at municipal council kondhali dist nagpur

Providing and supplying manpower for solid waste operation(collection of waste generated from house to house collecting, lifting and transporting upto dumping yard) at municipal council kondhali dist nagpur

Read more
Construction of 03 nos pcc foundation for installation of pump in ug sump including transportation laying and fitting of pipeline 4inch, 6inch and 8inch from surface to ug sump at bangwar ug mine of sohagpur area

Construction of 03 nos pcc foundation for installation of pump in ug sump including transportation laying and fitting of pipeline 4inch, 6inch and 8inch from surface to ug sump at bangwar ug mine of sohagpur area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise