Tender Details

Particulars Details
Title
Short Term Maintenance Contract Work For Ch 46.220 Km To 72.00 Km Of Nh 727 H In District Sitapur In The State Of Uttar Pradesh
Description
Short Term Maintenance Contract Work For Ch 46.220 Km To 72.00 Km Of Nh 727 H In District Sitapur In The State Of Uttar Pradesh
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 10000
EMD 11.55 Lakh
Tender Value
Place SITAPUR
Link

AAAAAAAAAA

Login to view
Start Date June 11, 2025 19:30
End Date

04/08/2025 ( 23 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26

Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26

Read more
Long term measures for permanent rectification black spot id-cg-(04)-01 from ch. 19.400 to 20.900 (infront of g.k. township to charoda bypass crossing) in the state of chhattisgarh

Long term measures for permanent rectification black spot id-cg-(04)-01 from ch. 19.400 to 20.900 (infront of g.k. township to charoda bypass crossing) in the state of chhattisgarh

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p

Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p

Read more
Consultancy services for preparation of detailed project report for the work construction 4l from 0/00 to 239/900 km balangir to nayagarh of nh-57.

Consultancy services for preparation of detailed project report for the work construction 4l from 0/00 to 239/900 km balangir to nayagarh of nh-57.

Read more
Consultancy services for preparation of detailed project report for the work widening and strengthening of existing 2l to 2lps from km 40/00 to 68/600 km podamari to mohana of nh-326 and from km 0/00 to km 102/900 mohana to paralakhemundi of nh 326a

Consultancy services for preparation of detailed project report for the work widening and strengthening of existing 2l to 2lps from km 40/00 to 68/600 km podamari to mohana of nh-326 and from km 0/00 to km 102/900 mohana to paralakhemundi of nh 326a

Read more
Construction of road from km 113.25 to km 160.75 of huri-taliha section of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh

Construction of road from km 113.25 to km 160.75 of huri-taliha&#x0d section of nh-913 (frontier highway) to intermediate lane on epc mode in the&#x0d state of arunachal pradesh

Read more
Construction of road from km 168.000 to km 183.400 of lada-sarli section of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh

Construction of road from km 168.000 to km 183.400 of lada-sarli&#x0d section of nh-913 (frontier highway) to intermediate lane on epc mode in the&#x0d state of arunachal pradesh

Read more
Construction of road from km 130.125 to km 156.095 of kharsang-miao- vijaynagar of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh

Construction of road from km 130.125 to km 156.095 of kharsang-miao-&#x0d vijaynagar of nh-913 (frontier highway) to intermediate lane on epc mode in&#x0d the state of arunachal pradesh

Read more
Construction of road from km 0.000 to km 78.38 of sarli-huri section of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh

Construction of road from km 0.000 to km 78.38 of sarli-huri section of&#x0d nh-913 (frontier highway) to intermediate lane on epc mode in the state of&#x0d arunachal pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise