Tender Details

Particulars Details
Title
Providing And Laying Hdpe Pipes For Protection From Dump Erosion In Mine At Block B Project( Monsoon 2024 25 Activity No. 7).
Description
Providing And Laying Hdpe Pipes For Protection From Dump Erosion In Mine At Block B Project( Monsoon 2024 25 Activity No. 7).
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_NCL_303655_1
Reference
Number
NCL/CIVIL/BLB/23-24/ETN/49 DATE 04.03.2024
Tender Fee 0
EMD 1.24 Lakh
Tender Value -
Place CIVIL ENGI. DEPT. BLOCK B AREA NCL Singrauli
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=314535

Start Date March 06, 2024 16:30
End Date
Expired 22/03/2024

Expired 934 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Annual procurement of pvc, cpvc, hdpe pipes and electrofusion fittings for water supply works

Annual procurement of pvc, cpvc, hdpe pipes and electrofusion fittings for water supply works

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Providing and laying hdpe pipes for protection from dump erosion in mine at block b project( monsoon 2024-25 activity no. 7).

Providing and laying hdpe pipes for protection from dump erosion in mine at block b project( monsoon 2024-25 activity no. 7).

Read more
Providing and laying hdpe pipes for protection of dump erosion at jhingurda project

Providing and laying hdpe pipes for protection of dump erosion at jhingurda project

Read more
Providing and laying hdpe pipe for protection from dump erosion at dudhichua project.

Providing and laying hdpe pipe for protection from dump erosion at dudhichua project.

Read more
Providing and laying hdpe pipe for protection from dump erosion at dudhichua project.

Providing and laying hdpe pipe for protection from dump erosion at dudhichua project.

Read more
Providing and laying hdpe pipeline for protection of dump erosion at amlohri project

Providing and laying hdpe pipeline for protection of dump erosion at amlohri project

Read more
Providing and laying hdpe pipeline for protection of dump erosion at amlohri project.

Providing and laying hdpe pipeline for protection of dump erosion at amlohri project.

Read more
Protection stabilizing ob dump slopes against erosion / sliding along rvr conveyor belt under kusmunda area.

Protection stabilizing ob dump slopes against erosion / sliding along rvr conveyor belt under kusmunda area.

Read more
Protection of embankment at erosion prone area with sand bags in different locations inside gocp mine of basundhara area for a period of 2025-26 monsoon

Protection of embankment at erosion prone area with sand bags in different locations inside gocp mine of basundhara area for a period of 2025-26 monsoon

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise