🛣️ Bid Invitation For Nh 507 Widening Project 🛣️ The Ministry Of Road Transport And Highways, Under The Central Government, Invites Bids For The Completion Of The Balance Work Of Widening Nh 507 From Km 60.00 To Km 64.825 (Actual Chainage From Km 59.700 To Km 64.525) In The State Of Uttarakhand. This Project Includes The Development Of The Road Into A Two Lane Road With Geometric Improvements Under The Engineering, Procurement, And Construction (Epc) Mode For The Financial Year 2023 24. 📅 Bid Submission Deadline: June 27, 2024, 12:00 Pm Tender Fee: Inr 11,800 Earnest Money Deposit (Emd): Inr 56,20,000 Eligible Bidders Are Requested To Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Project Specifications And Guidelines. Keywords: Nh 507, Road Widening, Geometric Improvement, Epc Mode, Ministry Of Road Transport And Highways, Government Tender, Bid Submission, Uttarakhand| Particulars | Details |
|---|---|
| Title |
Balance Work Of Widening To 2 Lane With Geometric Improvement From Km 60.00 To Km. 64.825 (Actual Chainage As Per Site Km. 59.700 To Km. 64.525 On Nh 507 In The State Of Uttarakhand Under Epc Mode In Nh(o) The Year 2023 24
|
| Description |
Balance Work Of Widening To 2 Lane With Geometric Improvement From Km 60.00 To Km. 64.825 (Actual Chainage As Per Site Km. 59.700 To Km. 64.525 On Nh 507 In The State Of Uttarakhand Under Epc Mode In Nh(o) The Year 2023 24
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_799468_1 |
|
Reference Number |
1148/13Yata-NH-10/2024 dated 05.03.2024 |
| Tender Fee | 11800 |
| EMD | 56.2 Lakh |
| Tender Value | - |
| Place | NH-123(507) |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840377 |
| Start Date | March 28, 2024 17:30 |
| End Date |
Expired
22/07/2024
Expired 817 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreConsultancy services for authority engineer for supervision of widening to 2 lane paved shoulder from existing chainage 12.000 to km 40.500 badhwala to lakhwar bend realignment from km. 12.00 to 31.122 on nh-507 length-25.660 km in the state of uttar
Widening to 2 lane paved shoulder from existing chainage 12.000 to km 40.500 badhwala to lakhwar bend realignment from km. 12.00 to 31.122 on nh-507 length-25.660 km in the state of uttarakhand on epc mode.
Read moreConsultancy services for preparation of detailed project report for construction of major bridge (approximate span 400m) along with its approaches connecting nh-507 with nh-707a near lakhwad bend in the state of uttarakhand
Consultancy services for preparation of detailed project report for construction of major bridge (approximate span 400m) along with its approaches connecting nh-507 with nh-707a near lakhwad bend in the state of uttarakhand
Read moreTreatment of 30 nos of landslide locations from km 64.380 to km 186.085 on nh-09 (old nh-125) in the state of uttarakhand under epc mode in nh(o) annual plan 2026-27
Treatment of 30 nos of landslide locations from km 64.380 to km 186.085 on nh-09 (old nh-125) in the state of uttarakhand under epc mode in nh(o) annual plan 2026-27
Read moreTreatment of 16 no of landslide location on nh-134 under epc mode in the state of uttarakhand under annual plan 2025-26
Treatment of 16 no of landslide location on nh-134 under epc mode in the state of uttarakhand under annual plan 2025-26
Read moreLandslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Landslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Read moreRehabilitation and up-gradation to 2-lane configuration of kanda to bageshwar road from km 103.25 to km 122.72 (existing chainage 110 to km 130) of nh-309a in the state of uttarakhand (package-ll) under nh(o)
Rehabilitation and up-gradation to 2-lane configuration of kanda to bageshwar road from km 103.25 to km 122.72 (existing chainage 110 to km 130) of nh-309a in the state of uttarakhand (package-ll) under nh(o)
Read moreConstruction of iconic hybrid cable stayed and suspension bridge across krishna river on nh -167k (design chainage km 87.360 to km 88.437) in the states of telangana and andhra pradesh on engineering, procurement and construction (epc) basis
Construction of iconic hybrid cable stayed and suspension bridge across krishna river on nh -167k (design chainage km 87.360 to km 88.437) in the states of telangana and andhra pradesh on engineering, procurement and construction (epc) basis
Read more8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor
Read moreof your Industry type