Tender Details
Particulars | Details |
---|---|
Title |
Wbpwd/Ee/Aed /E Niq 32/2023 24
|
Description |
Repairing And Reinstallation Work Of Split Type A.C Machines At Kazi Nazrul University Asansol In The Dist Of Paschim Bardhaman.
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2024_WBPWD_653427_1 |
Reference Number |
WBPWD/EE/AED /eNIQ- 32/2023-24 |
Tender Fee | 0 |
EMD | 4900 |
Tender Value | |
Place | ASANSOL |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1412130 |
Start Date | February 02, 2024 15:30 |
End Date |
08/02/2024 ( Expired 470 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&#x0d compatibility (emc) testing facility in&#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&#x0d
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreOperation and guarding of pumping machinery at pump house no. i under aug of sishubari w/s scheme, in the dist. of alipurduar.
Operation and guarding of pumping machinery at pump house no. i under aug of sishubari w/s scheme, in the dist. of alipurduar.
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreReplacement work of existing porcelain disc insulator strings by silicon rubber housed composite insulator (120 kn suspension type) for 400 kv s/c ratangarh stps ckt 1st and ckt 2nd at suspension towers
Replacement work of existing porcelain disc insulator strings by silicon rubber housed composite insulator (120 kn suspension type) for 400 kv s/c ratangarh-stps ckt 1st and ckt 2nd at suspension towers
Read moreConstruction of 01 nos surveillance cum op shelter acp shelter g 2 at bop bholaganj in aor of 110 bn bsf under shq bsf jowai sh pvdg iei fans and service connection and off grid solar plant
Construction of 01 nos surveillance cum op shelter acp shelter g 2 at bop bholaganj in aor of 110 bn bsf under shq bsf jowai sh pvdg iei fans and service connection and off grid solar plant
Read moreof your Industry type