Tender Details
About Tender
🚂 Invitation For Earthwork And Bridge Construction Bid 🛠️🌉 The Ministry Of Railways, Central Government, Invites Bids For Comprehensive Earthwork And Bridge Construction Services For The Multi Tracking Of The Railway Broad Gauge Line From Kalipahari To Andal, Including Yards, From Ir Chainage (Ch.) 189.40 Km To Ir Ch. 205.000 Km. 📅 Bid Submission Deadline: July 5, 2024, 3:00 Pm The Scope Of Work Includes Cutting And Filling, Blanketing, Construction Of Minor And Major Bridges, Road Over Bridges (Ror), Road Under Bridges (Rub), Retaining Walls, Level Crossings, Side Drains, Catch Water Drains, And Other Associated P Way (Permanent Way) Works. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 10,00,000 And Adhere To The Detailed Tender Documents For Complete Project Specifications. Keywords: Earthwork, Bridge Construction, Railway Bg Line, Multi Tracking, Ministry Of Railways, Central Government, Tender, Bid, Infrastructure ProjectParticulars | Details |
---|---|
Title |
Earthwork In Cutting And Filling, Blanketing, Construction Of Minor Bridges, Major Bridges, Ror, Rub, Rob, Retaining Wall, Level Crossing, Side Drain, Catch Water Drain, P Way Work And Other Ancillary Works In Between Kalipahari To Andal Including Yard From Ir Ch. 189.40 Km To Ir Ch. 205.000 Km In Connection With Construction Of Multi Tracking Railway Bg Line.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75300306 |
Reference Number |
05WTCAOCER2024-25 |
Tender Fee | 0 |
EMD | 1 Crore |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75300306/viewNitPdf_4582214.pdf |
Start Date | May 31, 2024 21:40 |
End Date |
05/07/2024 ( Expired 289 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Civil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Civil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Read moreEarthwork in railway formation including filling and cutting, blanketing and construction of major and minor bridges, box pushing, p-way track linking including supply of railway track ballast and p-way materials, fittings, point and crossing, drain
Earthwork in railway formation including filling and cutting, blanketing and construction of major and minor bridges, box pushing, p-way track linking including supply of railway track ballast and p-way materials, fittings, point and crossing, drain
Read moreEarthwork in cutting and filling, blanketing, construction of minor bridges, retaining wall, side drain, catch water drain, p way work and other ancillary works of 5th line in between dcop durgapur including yard of dcop from ch 171.503 km from hwh [ch 1453.00m from dgr] to ch 173.8221 km from hwh [ch 582.08m from dcop west cabin].
For complete deion and other details, please refer to tender
Read moreComposite work for earthwork in bank/cutting including blanketing material (for except major bridge locations), construction of minor bridges including rubs, supply of ballast, laying and linking of new bg rail line (including ajaygarh yard), transportation of sleepers & other p way material & misc. works between km 105.00 - km 110.00 of panna - khajuraho section of lalitpur singrauli new bg rail line project.
For complete deion and other details, please refer to tender
Read moreExecution of earthwork in formation by filling and cutting, blanketing, construction of minor bridges, side drain, central drain, catch water drain, protection work, p. way track linking work with ballast supply, construction of staff quarter, road work, platform work, circulating area, structural steel work for fob, metalizing work, transportation of p. way materials including other related works for the 4th line railway track between bagdehi at km: 493.373 (including yard) to dhutra (up to l
For complete deion and other details, please refer to tender
Read moreComposite work for earthwork in bank including blanketing material (for except major bridge locations), construction of minor bridges including rubs, supply of ballast, laying and linking of new bg rail line (including balupur yard), transportation of sleepers & other p way material & misc. works between km 110.00 - km 115.00 of panna - khajuraho section of lalitpur singrauli new bg rail line project.
For complete deion and other details, please refer to tender
Read moreScr construction organisation-guntakal division - new bg line between guntakal west & mallappa gate stations with rail over rail(ror) connectivity (9.64 km) - i) proposed guntakal west yard remodeling - (a) earthwork information including blanketing to irdge-0004 specifications,(b) construction of major & minor bridges,(c) construction of station building & goomties, (d) laying & linking of track, slewing/regarding/ctrp of existing track and other balance works at guntaka
For complete deion and other details, please refer to tender
Read moreConducting final location survey,traffic survey submission of comprehensive dpr for all civil, electrical and s&t work preparation of detail estimate alongwith alignment plan, yard plan , drawing for minor bridges, major bridges, rob/rub, fob , level crossing drawings , hydrological & geotechnical investigation and all other ancillary works, preparation & submission of epc tender document for all works including eletrical, trd and s&t for andal-sitarampur 6th line ( 34.00 km )
For complete deion and other details, please refer to tender
Read moreEarthwork in cutting and filling, blanketing, construction of minor bridges, major bridges, rub, rob, retaining wall, level crossing, side drain, catch water drain, p.way work and other ancillary works from ir ch. 205.000 km to 260.2 km between kalipahari (inc.) to pradhankhuta (exc.) in connection with construction of multi tracking railway bg line.
For complete deion and other details, please refer to tender
Read moreEarthwork in cutting and filling, blanketing, construction of minor bridges, major bridges, rub, rob, retaining wall, level crossing, side drain, catch water drain, p. way work and other ancillary works in between kalipahari to jurisdiction of asansol division including yard from ir ch. 205.000 km to 260.2 km in connection with construction of multi tracking railway bg line.
For complete deion and other details, please refer to tender
Read moreof your Industry type