Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kiifb Premonsoon Works Ambalappuzha Thiruvalla Road Phase 2 Kavumbhagam Idinjillam Road Muthoor Kuttoor Road Changanassery Kaviyoor Road In Pathanamythitta District Part Ts 4 General Civil Work
|
| Description |
Kiifb Premonsoon Works Ambalappuzha&Amp#X0d
Thiruvalla Road Phase 2 Kavumbhagam&Amp#X0d
Idinjillam Road Muthoor Kuttoor Road&Amp#X0d
Changanassery Kaviyoor Road In&Amp#X0d
Pathanamythitta District Part Ts 4 General&Amp#X0d
Civil Work
|
| Organisation | Kerala Road Fund Board | State Govt. and UT |
| Tender Id | 2024_KRFB_680770_1 |
|
Reference Number |
47/EE/KRFB-PMU/PTA/KTM/2024-25 |
| Tender Fee | 560 |
| EMD | 6354 |
| Tender Value | - |
| Place | EXECUTIVE ENGINEER |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1058934 |
| Start Date | July 17, 2024 18:30 |
| End Date |
Expired
25/07/2024
Expired 757 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Kiifb-hill highway phase i from 43rd mile(0/000) to valad(8/200) in wayanad district - stage 2-additional investigation - investigation work
Kiifb-hill highway phase i from 43rd mile(0/000) to valad(8/200) in wayanad district - stage 2-additional investigation - investigation work
Read moreRepair & retrofitting work of high level rcc bridge (23 x18.75m) over morhar river in cherki-baijudham- gurua mdr road in gaya district
Repair & retrofitting work of high level rcc bridge (23 x18.75m) over morhar river in cherki-baijudham- gurua mdr road in gaya district
Read moreGeneral-rm - 2026-27 -rc1- one year running contract for various pwd roads under roads section koduvally ( given to maintenance wing)in kozhikode district 3 road stretches for a length of 8.80 km-running contract (rc1)-general civil work
General-rm - 2026-27 -rc1- one year running contract for various pwd roads under roads section koduvally ( given to maintenance wing)in kozhikode district 3 road stretches for a length of 8.80 km-running contract (rc1)-general civil work
Read moreConstruction of library study center building with modern facilities near municipal council high school in ward no 5 sanner furniture work electrical fire and hvac work g and 2 floors part b and c third call
Construction of library study center building with modern facilities near municipal council high school in ward no 5 sanner furniture work electrical fire and hvac work g and 2 floors part b and c third call
Read moreWidening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Read moreDemolition of old superstructure & construction of new superstructure including overall maintenance + retrofitting work of high level rcc bridge (4x21.75m) in gaya koilwan road via pirthu, vishambharpur, gothani road at chainage-0.89 km in aurangabad district .
Demolition of old superstructure & construction of new superstructure including overall maintenance + retrofitting work of high level rcc bridge (4x21.75m) in gaya koilwan road via pirthu, vishambharpur, gothani road at chainage-0.89 km in aurangabad district .
Read moreOnstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Read moreConstruction of a rcc drain and pcc road from awadhesh raut's house to vishal kumar's house in badal gali, mohalla nauwagadhi (2) pcc road repair work from amitabh sinha's house to ramakrishna ashram turn in the upper lane of mohalla brahmini ghat gaya ji under ward no.-39
Construction of a rcc drain and pcc road from awadhesh raut's house to vishal kumar's house in badal gali, mohalla nauwagadhi (2) pcc road repair work from amitabh sinha's house to ramakrishna ashram turn in the upper lane of mohalla brahmini ghat gaya ji under ward no.-39
Read moreConstruction work of (1) pcc road and rcc drain from the house of md. afroz in pasi tola through vikas's house to rupali's house, and (2) pcc road and rcc drain from devanti chaudhary's house to mukur chaudhary's house, under ward no. 35. gaya ji
Construction work of (1) pcc road and rcc drain from the house of md. afroz in pasi tola through vikas's house to rupali's house, and (2) pcc road and rcc drain from devanti chaudhary's house to mukur chaudhary's house, under ward no. 35. gaya ji
Read more(1)under ward no.-38, in nadaraganj locality, chhoti daha gali, construction work of a rcc drain and road from dr. nanhu's house through sonu ansari's house up to haider ansari's house (2)under ward no.-38, in nadaraganj locality, badi daha gali, construction work of a rcc drain and road from naushad qureshi's house up to mithun qureshi's house (3)under ward no.-38, in nadaraganj locality, slaughter house gali, construction work of a rcc drain from bandhu master's house up to china khan's hous
(1)under ward no.-38, in nadaraganj locality, chhoti daha gali, construction work of a rcc drain and road from dr. nanhu's house through sonu ansari's house up to haider ansari's house (2)under ward no.-38, in nadaraganj locality, badi daha gali, construction work of a rcc drain and road from naushad qureshi's house up to mithun qureshi's house (3)under ward no.-38, in nadaraganj locality, slaughter house gali, construction work of a rcc drain from bandhu master's house up to china khan's house under gmc gaya ji
Read moreof your Industry type