Tender Details
Particulars | Details |
---|---|
Title |
Egg Fresh Avadi,Egg Fresh Avadi 2,Egg Fresh Avadi 3,Egg Fresh Avadi 4,Egg Fresh Avadi 5
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2024/B/4761395 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | March 11, 2024 15:31 |
End Date |
21/03/2024 ( Expired 424 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | ACME TRADING CO | - | 19-03-2024 16:14:31 | MSE | Qualified |
2 | GOODWILL TRADERS | - | 19-03-2024 12:36:55 | MSE | Qualified |
3 | KITES SOLUTIONS | - | 18-03-2024 14:52:24 | MSE | Qualified |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreDevelopment, operation and maintenance of wayside amenities 3 o and m sites in uttar pradesh and 1 o and m site in odisha (4 o and m sites)nh-520/ rourkela rimuli/166 plus 500 /lhs/ basudevpur/odisha
Development, operation and maintenance of wayside amenities 3 o and m sites in uttar pradesh and 1 o and m site in odisha (4 o and m sites)nh-520/ rourkela rimuli/166 plus 500 /lhs/ basudevpur/odisha
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreSup of veg and fruit fresh at 3 wing af and hq wac for the pd from 01 oct 2025 to 30 sep 2026
Sup of veg and fruit fresh at 3 wing af and hq wac for the pd from 01 oct 2025 to 30 sep 2026
Read moreAugmentation and rehabilitation of water supply scheme canal water based water supply project for const. of 10 mld wtp and other related works including 5 years o and m at mukerian distt. hsp. punjab part-2 under amrut 2.0 scheme
Augmentation and rehabilitation of water supply scheme canal water based water supply project for const. of 10 mld wtp and other related works including 5 years o and m at mukerian distt. hsp. punjab part-2 under amrut 2.0 scheme
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreof your Industry type