Tender Details

Particulars Details
Title
Repair And Overhauling Service Dsl E47 Repair Of Pme Exhaust Flap Make Ms Mtu Model 16 V2000 M92 Th
Description
Organisation Department of Defence | Ministry of Defence
Tender Id GEM/2024/B/5508430
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date October 16, 2024 05:03
End Date
Expired 28/10/2024

Expired 720 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 6 Lakhs Experience with Gov. Required: Years Project Experience Required: Yes
Ministry: Ministry Of Defence
Department: Department Of Defence
Organisation: Indian Coast Guard

Technical Evaluation Results

S.No. Seller Name Participated On MSE/MII Status Status
1 YEOMAN MARINE PVT LTD 25-10-2024 11:57:19 MSE Qualified
Similar Tenders
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e075 sea water leakage observed from exhaust pipe line of port da between exhaust flap valve and hull penetration area leakage needs to be arrested by weldin..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e076 ac condenser safety valve discharge pipeline to be routed outside of compartment qty02 nos pipeline length 03 mtr all inway jobs included mat copper dia..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e077 01 in no fire hydrant dia 55 mm locking pin deteriorated locking pin to be repaired renewed as per sample service provider,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e078 lub oil leakage observed from sme lo replenishment pump discharge pipeline near sump area pipe dia 20 mm length 35 feet mat ms leakage needs to be arres..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e075 sea water leakage observed from exhaust pipe line of port da between exhaust flap valve and hull penetration area leakage needs to be arrested by weldin..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e076 ac condenser safety valve discharge pipeline to be routed outside of compartment qty02 nos pipeline length 03 mtr all inway jobs included mat copper dia..,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e077 01 in no fire hydrant dia 55 mm locking pin deteriorated locking pin to be repaired renewed as per sample service provider,repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c-423 e078 lub oil leakage observed from sme lo replenishment pump discharge pipeline near sump area pipe dia 20 mm length 35 feet mat ms leakage needs to be arres..

Read more
Repair and overhauling service - installation of new lop in port main engine (l-012) of icgs c-158 make: m/s mtu, germany, model : 16v2000m92 no buyer premises

Repair and overhauling service - installation of new lop in port main engine (l-012) of icgs c-158 make: m/s mtu, germany, model : 16v2000m92 no buyer premises

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise