Tender Details

Particulars Details
Title
Structural Design Worksuite Staadpro Advanced Software
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2023/B/4400966
Reference
Number
Tender Fee
EMD
Tender Value
Place
Link https://bidplus.gem.gov.in/all-bids
Start Date January 29, 2024 16:18
End Date

19/02/2024 ( Expired 464 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: 2 Lakhs Experience with Gov. Required: Years
Buyer Details
Name: ***********
Address: *********** CHENNAI
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army
Office Address: ***********
Technical Evaluation
S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 APPLE INFOTECH Make : Bentley Model : Bentley Structural Work Suite Title : Structural Work Suite 26-02-2024 07:30:46 MII Qualified
2 KATWA SOFTWARE TECHNOLOGIES Make : STRUCTURAL DESIGN STAADPRO ADVANCED Model : STAAD Pro Structural WorkSuite Title : STAAD Pro Structural WorkSuite 29-02-2024 08:30:28 MII Qualified
Financial Evaluation
S.No. Seller Name Offered Item Total Price Rank
1 APPLE INFOTECH(MII) Item Categories : STRUCTURAL DESIGN WORKSUITE STAADPRO ADVANCED SOFTWARE 237770.00 L1
2 KATWA SOFTWARE TECHNOLOGIES (MII) Item Categories : STRUCTURAL DESIGN WORKSUITE STAADPRO ADVANCED SOFTWARE 683798.70 L2
Similar Tenders
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.

Read more
Selection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project

Selection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project

Read more
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Design and construction of puthukkad rob in thrissur district

Design and construction of puthukkad rob in lieu of lc no. 28 and 29 in thrissur district

Read more
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Read more
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Read more
Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.

Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.

Read more
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode

Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise