Title
Intelligent Rack, Smat Pdu For Existing Dara Center & Ac Timer
Description
Organisation Department of Defence Production | Ministry of Defence
Tender Id GEM/2024/B/5606990
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date November 14, 2024 20:56
End Date
Expired 25/11/2024

Expired 692 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Ministry: Ministry Of Defence
Department: Department Of Defence Production
Organisation: Bharat Electronics Limited (bel)
Similar Tenders
Extension work for existing health sub center

Extension work for existing health sub center

Read more
Lstk project for transforming the existing subir raha oil museum dehradun into the subir raha energy experience center

Lstk project for transforming the existing subir raha oil museum dehradun into the subir raha energy experience center by making it contemporary extensively digital savvy and highly interactive

Read more
Onsite comprehensive maintenance contract for the existing digital epabx system, ippbx system, telephones, gateways, ups, battery system, network switches, equipment rack installed at intelligence branch

Onsite comprehensive maintenance contract for the existing digital epabx system, ippbx system, telephones, gateways, ups, battery system, network switches, equipment rack installed at intelligence branch

Read more
Replacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material

Replacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material & as per tender document

Read more
Wooden cabinet,new working wooden table,new wooden sethi cum bed,wall mount stand for setup stand,wooden rack stand,repairing of existing camera,adhesion of existing mats,providing double partitions in existing racks,providing beading in existing racks,providing wooden pillars between open racks,providing wooden pillars between open racks,non slip mat with anti slip gripper

Wooden cabinet,new working wooden table,new wooden sethi cum bed,wall mount stand for setup stand,wooden rack stand,repairing of existing camera,adhesion of existing mats,providing double partitions in existing racks,providing beading in existing racks,providing wooden pillars between open racks,providing wooden pillars between open racks,non slip mat with anti slip gripper

Read more
Sdf 2025-26, est. cost 10.00 lakhs(1st call), extension work for existing health sub center at gatrropally (v) of kasipet mandal of mancerial district

Sdf 2025-26, est. cost 10.00 lakhs(1st call), extension work for existing health sub center at gatrropally (v) of kasipet mandal of mancerial district

Read more
(i) roof renewal in existing sick line covered shed and (ii) construction of compound wall with two wheeler stand at coach care center at tpj.

(i) roof renewal in existing sick line covered shed and (ii) construction of compound wall with two wheeler stand at coach care center at tpj.

Read more
Nvr 16 channel with 8 tb storage,cat 6 utp cable 305 mtr,8 port poe switch with sfp,power strip,6u outdoor rack,electric wire 1.5mm pvc 90 mtr,55 inch 4k led monitor,t box and splicing,pdu,30w poe injector,5 mp ptz camera with accessories,ofc 4 core unarmoured,iron pole 20 feet

Nvr 16 channel with 8 tb storage,cat 6 utp cable 305 mtr,8 port poe switch with sfp,power strip,6u outdoor rack,electric wire 1.5mm pvc 90 mtr,55 inch 4k led monitor,t box and splicing,pdu,30w poe injector,5 mp ptz camera with accessories,ofc 4 core unarmoured,iron pole 20 feet

Read more
48 port layer 2 managed access switch with sfp,24 port layer 2 managed access switch with sfp,8 port layer 2 managed access switch with sfp,cat6a information outlet with base and face plate,cat6a utp cable box 305 mtr,12u rack wall mount with pdu and fan,9u rack wall mount with pdu and fan,12 core sm armoured fiber optic cable per mtr,sm fiber patch cord 3 mtr.,cat6a 24 port fully loaded patch panel,cat6a 12 port fully loaded patch panel,cat6 patch cord 0.5 mtr.,cat6 patch cord 3 mtr.,6 port fully loaded liu,24 port fully loaded liu,network controller,28320506_inverter ups 1kva ups,340104_2 kva ups,installation and commissioning of active and passive components,shifting charges 42u rack, core switch, router, fiber etc. from gm office,hdpe and fiber with digging hard soft, laying and splicing,structure cabling including suitable conduit and laying

48 port layer 2 managed access switch with sfp,24 port layer 2 managed access switch with sfp,8 port layer 2 managed access switch with sfp,cat6a information outlet with base and face plate,cat6a utp cable box 305 mtr,12u rack wall mount with pdu and fan,9u rack wall mount with pdu and fan,12 core sm armoured fiber optic cable per mtr,sm fiber patch cord 3 mtr.,cat6a 24 port fully loaded patch panel,cat6a 12 port fully loaded patch panel,cat6 patch cord 0.5 mtr.,cat6 patch cord 3 mtr.,6 port fully loaded liu,24 port fully loaded liu,network controller,28320506_inverter ups 1kva ups,340104_2 kva ups,installation and commissioning of active and passive components,shifting charges 42u rack, core switch, router, fiber etc. from gm office,hdpe and fiber with digging hard soft, laying and splicing,structure cabling including suitable conduit and laying

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise