Tender Details
Particulars | Details |
---|---|
Title |
Ttps Es Em Iii Replacing The Existing Wornout Ms Roof By A New Galvanume Sheet In Pa Fan Motor 4 B And 5 B In Unit 4 And 5 Boiler Area
|
Description |
Ttps Es Em Iii Replacing The Existing Wornout Ms Roof By A New Galvanume Sheet In Pa Fan Motor 4 B And 5 B In Unit 4 And 5 Boiler Area
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_501575_1 |
Reference Number |
CE/SE/ES /TTPS /No.276/2024-25 |
Tender Fee | 0 |
EMD | 1200 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=596449 |
Start Date | November 15, 2024 19:45 |
End Date |
30/11/2024 ( Expired 190 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification works by attending patchup to the existing damaged 457.5 e bt road from unit 4 and 5 entrance to jt 3 building towards south side at ttps
Rectification works by attending patchup&#x0d to the existing damaged 457.5 e bt road from unit 4 and 5&#x0d entrance to jt 3 building towards south side at ttps
Read moreTtps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Ttps mech ii bm unit iii replacement of wornout corroded structural supports painting of structurals removal of existing wornout asbestos sheets and providing new galvalume sheets in all four sides in unit iii boiler at 56mtr elevation
Read morePuthiyidom devaswom in mavelikkara group- repairs and maintenanace to the existing stage and green room by providing a new roof by replacing the damaged one reg. retender
Puthiyidom devaswom in mavelikkara group- repairs and maintenanace to the existing stage and green room by providing a new roof by replacing the damaged one reg. retender
Read moreReplacing the damaged portable toilet by fixing new portable frp toilet near ee shift room at 15.50 m level in power house unit 4 and 5
Replacing&#x0d the damaged portable toilet by fixing new portable frp toilet&#x0d near ee shift room at 15.50 m level in power house unit 4 and 5
Read moreTtps operation circle cad unit iii cw pump 6.6kv,500 kw jyothi make cw pump motor top bearing oil and water chamber and side air cooler pipes cleaning, and complete cleaning of converging and diverging type fan and fan cover by using soap oil and pai
Ttps operation circle cad unit iii cw pump 6.6kv,500 kw jyothi make cw pump motor top bearing oil and water chamber and side air cooler pipes cleaning, and complete cleaning of converging and diverging type fan and fan cover by using soap oil and pai
Read moreHydraulic roof bolting with resin capsules by contractual means with providing 5 nos dgms approved hydraulic roof bolting machine in the panel w 5a and w 5b of lower workable seam at chhatarpur mine no 1, pathakhera area, wcl
Hydraulic roof bolting with resin capsules by contractual means with providing 5 nos dgms approved hydraulic roof bolting machine in the panel w 5a and w 5b of lower workable seam at chhatarpur mine no 1, pathakhera area, wcl
Read moreImprovement works to the 4 tenements of 6g quarters by replacing the existing damaged gi sheet roofing by galvanium colour coding sheet for arresting roof leakages , plastering, flooring, wiring and other allied works at thekkady
Improvement works to the 4 tenements of 6g quarters by replacing the existing damaged gi sheet roofing by galvanium colour coding sheet for arresting roof leakages , plastering, flooring, wiring and other allied works at thekkady
Read moreThermal insulation in different areas of boiler and auxiliaries, esp, ducting, ms line, crh line, hrh line and id fan area of unit 7 or 8, dpps during overhauling period.
Thermal insulation in different areas of boiler and auxiliaries, esp, ducting, ms line, crh line, hrh line and id fan area of unit 7 or 8, dpps during overhauling period.
Read moreTtps es circle em i rewinding of 5 nos lt 3 phase 415v 1 2kw cooler fan motors of single phase generator transformer at unit iii
Ttps es circle em i rewinding of 5 nos lt 3 phase 415v 1 2kw cooler fan motors of single phase generator transformer at unit iii
Read moreTtps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreof your Industry type