Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Es Circle Em Iii Unit V Replacing The Existing Damaged Steel Wire Mesh In Pa Fan Motor 4 A 4 B And 5 B Fd Motor 4 A Id Motor 5 B And Coal Mill Motor 4 A And 5 A In Unit 4 And 5.
|
Description |
Ttps Es Circle Em Iii Unit V Replacing The Existing Damaged Steel Wire Mesh In Pa Fan Motor 4 A 4 B And 5 B Fd Motor 4 A Id Motor 5 B And Coal Mill Motor 4 A And 5 A In Unit 4 And 5.
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 400 |
Tender Value | |
Place | TTPS |
Link |
AAAAAAAAAA Login to view |
Start Date | July 01, 2025 19:30 |
End Date |
16/07/2025 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps es circle em iii replacement of worm out gi earth flat by new earth flat size 50 x 10 mm and reconnecting of earth fit of ahp ii foph ii and wtp ii in unit iv and v
Ttps es circle em iii replacement of worm out gi earth flat by new earth flat size 50 x 10 mm and reconnecting of earth fit of ahp ii foph ii and wtp ii in unit iv and v
Read moreTtps es circle em iii unit v replacing the existing damaged steel wire mesh in pa fan motor 4a 4b and 5b fd motor 4a id motor 5b and coal mill motor 4a and 5a in unit 4 and 5.
Ttps es circle em iii unit v replacing the existing damaged steel wire mesh in pa fan motor 4a 4b and 5b fd motor 4a id motor 5b and coal mill motor 4a and 5a in unit 4 and 5.
Read moreTtps es circle em iii unit v replacing the coal mill motor 5e sl no 188040 by a spare coal mill motor sl no 32260 a401 04 10 in unit 5 boiler area and overhauling released the coal mill motor sl no 188040
Ttps es circle em iii unit v replacing the coal mill motor 5e sl no 188040 by a spare coal mill motor sl no 32260 a401 04 10 in unit 5 boiler area and overhauling released the coal mill motor sl no 188040
Read moreTtps es circle em iii external painting of lt switchgear modules and breaker panels writing the module service names and breaker panel service names by painting the background in unit v
Ttps es circle em iii external painting of lt switchgear modules and breaker panels writing the module service names and breaker panel service names by painting the background in unit v
Read moreTtps es circle em iii load testing of 2 nos 15 tonne capacity wire rope electric hoists at id fan 4a and 4b and 5a and 5b of unit iv and v boiler area
Ttps es circle em iii load testing of 2 nos 15 tonne capacity wire rope electric hoists at id fan 4a and 4b and 5a and 5b of unit iv and v boiler area
Read moreTtps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Read moreTtps operation circle mpmii unit iv and v replacing the worn out journal head assembly by reconditioned sets in hp 803 mills
Ttps operation circle mpmii unit iv and v replacing the worn out journal head assembly by reconditioned sets in hp 803 mills
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Read moreNctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Nctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Read moreof your Industry type