Tender Details
Particulars | Details |
---|---|
Title |
Stator Frame M/Cng (From 1801 Mm To 3000 Mm Length) As Per
|
Description |
Stator Frame M/Cng (From 1801 Mm To 3000 Mm Length) As Per
Annexure I.
|
Organisation | Bharat Heavy Electricals Limited (BHEL) |
Tender Id | 2023_BHEL_25512_1 |
Reference Number |
E2833010 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | BHEL BHOPAL |
Link | https://eprocurebhel.co.in |
Start Date | June 08, 2023 23:30 |
End Date |
21/06/2023 ( Expired 698 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreEngagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Read moreEngagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Read moreConstruction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreof your Industry type