Tender Details
Particulars | Details |
---|---|
Title |
Setup New Lab At Galsi With Stacking Of Departmental Materials For On Going Jjm Scheme (Galsi Pwss) Under Dwsd,Phe Dte
|
Description |
Setup New Lab At Galsi With Stacking Of Departmental Materials For On Going Jjm Scheme (Galsi Pwss) Under Dwsd,Phe Dte
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2025_PHED_831451_3 |
Reference Number |
eNIQ-06/24-25/EE/DWSD/PHE Dte |
Tender Fee | 0 |
EMD | 15000 |
Tender Value | |
Place | Galsi |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1852071 |
Start Date | March 29, 2025 14:30 |
End Date |
15/04/2025 ( Expired 55 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreWork of construction of new open platform for stacking of materials at 400kv sub-station, kashipur
Work of construction of new open platform for stacking of materials at 400kv sub-station, kashipur
Read moreConstruction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Construction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Read morePhe/swsd/ee/niet- 07 of 2025-26 (sl.no. 01 )
Day to day operation and maintenance of 12 mgd 55.02 mld water treatment plant at fulbari, p.s. rajganj, dist. jalpaiguri for siliguri comprehensive water supply scheme under siliguri w/s division, p.h.e. dte.,for 12 months from 01.07.25 365 days
Read moreAAAAAAAAAA
Login to viewSupply, delivery and installation overhead pole at para water supply scheme (intake site) and other allied works under pmd, phe dte.
Read moreIe services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Read moreConstruction of 01 vocational lab under pm shri scheme at kv danapur and provn of store room on the seventh floor of the mo at cda patna under ge danapur cantt
Construction of 01 vocational lab under pm shri scheme at kv danapur and provn of store room on the seventh floor of the mo at cda patna under ge danapur cantt
Read moreAAAAAAAAAA
Login to viewSupply and installation of submersible pump motor sets at flood affected river bed tubewell with supply of necessary substitutes at different water supply scheme under arsha block under pmd, phe dte. in the district of purulia.
Read moreCreation of 250kva s/stn at parsotikotli hari singh,2x100 kva s/stns at kancheri gurhapattan including laying of required 11 kv taplines lt network for dispersal of power under deposit work of jalshakti sdjanipur sdakhnoor under jjm scheme
Creation of 250kva s/stn at parsotikotli hari singh,2x100 kva s/stns at kancheri gurhapattan including laying of required 11 kv taplines lt network for dispersal of power under deposit work of jalshakti sdjanipur sdakhnoor under jjm scheme
Read moreof your Industry type