Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I M I Ca Cws I Overhauling Of 1600 Mm Bfv Including Actuator Gb Overhauling Checking And Renewal Of Nitrile Rubber Seal Painting Of Intake Screen Of Cooling Water Pumps 2 A 2 B And 2 C Etc
|
| Description |
Mtps I M I Ca Cws I Overhauling Of 1600 Mm Bfv Including Actuator Gb Overhauling Checking And Renewal Of Nitrile Rubber Seal Painting Of Intake Screen Of Cooling Water Pumps 2 A 2 B And 2 C Etc
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_490539_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / CA /OT. 213 / 2024-25 |
| Tender Fee | 0 |
| EMD | 4100 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=582880 |
| Start Date | October 03, 2024 23:30 |
| End Date |
Expired
17/10/2024
Expired 726 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i m i ca cws i unit ii overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 2a 2b and 2c etc
Mtps i m i ca cws i unit ii overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 2a 2b and 2c etc
Read moreMtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b and 2c for the year 2026 2027
Mtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b and 2c for the year 2026 2027
Read moreMtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Read moreImprovement work of vasundhara sai-2a, 2b and 2c road by resurfacing and perforated tiles on side panels.
Improvement work of vasundhara sai-2a, 2b and 2c road by resurfacing and perforated tiles on side panels.
Read moreMtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Read moreMtpsi tm i unit ii annual maintenance work in main turbine its auxiliaries and overhauling of alfa laval centrifuges 2a 2b during 2026 27
Mtpsi tm i unit ii annual maintenance work in main turbine its auxiliaries and overhauling of alfa laval centrifuges 2a 2b during 2026 27
Read moreMtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Read moreMtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Read moreMtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii
Mtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii
Read moreMtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Read moreof your Industry type