Mtps I M I Ca Cws I Overhauling Of 1600 Mm Bfv Including Actuator Gb Overhauling Checking And Renewal Of Nitrile Rubber Seal Painting Of Intake Screen Of Cooling Water Pumps 2 A 2 B And 2 C Etc
|
Description |
Mtps I M I Ca Cws I Overhauling Of 1600 Mm Bfv Including Actuator Gb Overhauling Checking And Renewal Of Nitrile Rubber Seal Painting Of Intake Screen Of Cooling Water Pumps 2 A 2 B And 2 C Etc
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_490539_1 |
Reference Number |
CE / MTPS-I / SE / M-I / CA /OT. 213 / 2024-25 |
Tender Fee | 0 |
EMD | 4100 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=582880 |
Start Date | October 03, 2024 23:30 |
End Date |
17/10/2024 ( Expired 231 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i
Mtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i
Read moreMtps i ca cws i overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 1a 1b and 1c and allied works
Mtps i ca cws i overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 1a 1b and 1c and allied works
Read moreMtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreMtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Mtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Read moreMtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves including painting of ct safety grills etc
Mtps i m i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves gate valves including painting of ct safety grills etc
Read moreMtps i ca cws i complete dismantling inspection overhaul and renewal of pump components in 1 no cooling water pump of capacity 16000 m3 hr single stage vmf model 1175 kw motor in stage i
Mtps i ca cws i complete dismantling inspection overhaul and renewal of pump components in 1 no cooling water pump of capacity 16000 m3 hr single stage vmf model 1175 kw motor in stage i
Read moreMtps i ca cws ii overhauling of existing id fan gearbox for 4 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in ct ii
Mtps i ca cws ii overhauling of existing id fan gearbox for 4 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in ct ii
Read moreMtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b 2c
Mtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b 2c
Read moreMtps i ca cws ii overhauling of existing id fan gearbox for 5 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower stage ii
Mtps i ca cws ii overhauling of existing id fan gearbox for 5 nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in cooling tower stage ii
Read moreMtps i mill plant unit ii dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2a to 2f and fabrication of various lengths of 40 nb cooling water pipe flange and assembling in the 2a
Mtps i mill plant unit ii dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2a to 2f and fabrication of various lengths of 40 nb cooling water pipe flange and assembling in the 2a