Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cable Gland Sealing Compound,Eed 50 79 3026,Warranty Extension For 1st Year,Warranty Extension For
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2024/B/4757046 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 09, 2024 16:30 |
| End Date |
Expired
19/03/2024
Expired 939 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | KRISHNA ENTERPRISES | - | 06-04-2024 17:18:17 | MII MSE | Disqualified |
| 2 | OCEAN MARINE ENVIRONMENT COATINGS PRIVATE LIMITED | - | 04-04-2024 14:02:22 | MII MSE | Qualified |
Sealing compound,heavy duty cleaner degreaser (oks 2601)
Sealing compound,heavy duty cleaner degreaser (oks 2601)
Read moreSealing compound of ilcb water based pre-polymer urethane
Sealing compound of ilcb water based pre-polymer urethane
Read moreBlood gas analyser machine,abg samples fifty sample per day,cmc for 1st year post warranty,cmc for 2nd year post warranty,cmc for 3rd year post warranty,cmc for 4th year post warranty,cmc for 5th year post warranty,cmc for 6th year post warranty,cmc for 7th year post warranty,cmc for 8th year post warranty
Blood gas analyser machine,abg samples fifty sample per day,cmc for 1st year post warranty,cmc for 2nd year post warranty,cmc for 3rd year post warranty,cmc for 4th year post warranty,cmc for 5th year post warranty,cmc for 6th year post warranty,cmc for 7th year post warranty,cmc for 8th year post warranty
Read morePolyurethene based water proofing (high performance) compound (with five year leak proof warranty) a
Polyurethene based water proofing (high performance) compound (with five year leak proof warranty) a
Read moreSuply of pipeline simulator at jobner,instalation and commissioning of pts jobner,camc year 1 post warranty,camc year 2 post warranty,camc year 3 post warranty,camc year 4 post warranty,camc year 5 post warranty,additional man day charges warrnty period,additional man day charges 1st and 2nd year post warranty,additional man day charges 3rd and 4th year post warranty,additional man day charges 5th year post warranty
Suply of pipeline simulator at jobner,instalation and commissioning of pts jobner,camc year 1 post warranty,camc year 2 post warranty,camc year 3 post warranty,camc year 4 post warranty,camc year 5 post warranty,additional man day charges warrnty period,additional man day charges 1st and 2nd year post warranty,additional man day charges 3rd and 4th year post warranty,additional man day charges 5th year post warranty
Read moreConstruction of manhole and sewer line arrangements work, manhole raising , frc at vellaisamy servai compound in ward 50
Construction of manhole and sewer line arrangements work, manhole raising , frc at vellaisamy servai compound in ward 50
Read moreFuel feed pump mico,fuel flexible pipe,oil filter,filter assy air intake,fuel filter,insulation tape elec coton self,m seal,sealing compound anabond
Fuel feed pump mico,fuel flexible pipe,oil filter,filter assy air intake,fuel filter,insulation tape elec coton self,m seal,sealing compound anabond
Read moreSdf 2025-26, est. cost 10.00 lakhs(1st call), extension work for existing health sub center at gatrropally (v) of kasipet mandal of mancerial district
Sdf 2025-26, est. cost 10.00 lakhs(1st call), extension work for existing health sub center at gatrropally (v) of kasipet mandal of mancerial district
Read moreMens weightlifting set,womens weightlifting set,archery riser,archery riser,archery limb,archery limb,archery limb,archery limb,archery limb,archery limb,archery limb,long stabiliser,long stabiliser,short stabiliser,short stabiliser,stabiliser extension,stabiliser extension,v bar,compound bow,compound bow,compound bow,compound bow,sight scope,sight bar,long stabiliser,long stabiliser,short stabiliser,releaser,releaser,arrow rest,arrow shaft,arrow shaft,arrow shaft,arrow shaft,arrow shaft,arrow shaft,arrow shaft,arrow points,tungsten points,spin vanes,nocks,nocks,pin nock,pin,vanes
Mens weightlifting set,womens weightlifting set,archery riser,archery riser,archery limb,archery limb,archery limb,archery limb,archery limb,archery limb,archery limb,long stabiliser,long stabiliser,short stabiliser,short stabiliser,stabiliser extension,stabiliser extension,v bar,compound bow,compound bow,compound bow,compound bow,sight scope,sight bar,long stabiliser,long stabiliser,short stabiliser,releaser,releaser,arrow rest,arrow shaft,arrow shaft,arrow shaft,arrow shaft,arrow shaft,arrow shaft,arrow shaft,arrow points,tungsten points,spin vanes,nocks,nocks,pin nock,pin,vanes
Read moreAnnual plan-chathamangalam gp 2026-27 pro no144 pullanoor sub center compound wall costruction df mgnr 7 50 lakhs ward 24 general civil work
Annual plan-chathamangalam gp 2026-27 pro no144 pullanoor sub center compound wall costruction df mgnr-7 50 lakhs ward 24 general civil work
Read moreof your Industry type