Repairing Of New Allen Berry Make Ckc 450, 300k W Gearbox Of 1400mm 2nd Belt Of Mic, J P Colliery
Description
Repairing Of New Allen Berry Make Ckc 450, 300k W Gearbox Of 1400mm 2nd Belt Of Mic, J P Colliery
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_329164_1
Reference
Number
ECL/GM/JNR/EnM/A2/24-25/141 dated 12.02.2025
Tender Fee 0
EMD 5200
Tender Value -
Place JHANJRA UNDERGROUND
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341186

Start Date February 18, 2025 16:30
End Date
Expired 28/02/2025

Expired 593 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Installation 2 300kw 1400mm 2nd belt conveyor complete drive head in main incline including all associated job at mic, jhanjra project colliery

Installation 2 300kw 1400mm 2nd belt conveyor complete drive head in main incline including all associated job at mic, jhanjra project colliery

Read more
Procurement of complete gearbox along with spares of new allen berry works make worm reduction gearbox type and size sua 6 ratio 60 1 installed at 4x210 mw chp i sgtps mppgcl birsinghpur

Procurement of complete gearbox along with spares of new allen berry works make worm reduction gearbox type and size sua 6 ratio 60 1 installed at 4x210 mw chp i sgtps mppgcl birsinghpur

Read more
Transportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery

Transportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery

Read more
Fabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery

Fabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery

Read more
Fabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery

Fabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery

Read more
Transportation and replacement of bottom roller by fitting of bottom pressure roller along with fitting of pressure roller hanger in 1400mm 2nd belt conveyor and transportation of old bottom rollers at surface of mic, jhanjra project colliery.

Transportation and replacement of bottom roller by fitting of bottom pressure roller along with fitting of pressure roller hanger in 1400mm 2nd belt conveyor and transportation of old bottom rollers at surface of mic, jhanjra project colliery.

Read more
Removing old iron structure such as belt structure, 1200mm and 1000 mm belt piece, gearbox, coupling etc. from 500mh main line between 500mh pit bottom to rok along 500mmh main line at moonidih colliery, w j area

Removing old iron structure such as belt structure, 1200mm and 1000 mm belt piece, gearbox, coupling etc. from 500mh main line between 500mh pit bottom to rok along 500mmh main line at moonidih colliery, w j area&#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise