Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of New Allen Berry Make Ckc 450, 300k W Gearbox Of 1400mm 2nd Belt Of Mic, J P Colliery
|
| Description |
Repairing Of New Allen Berry Make Ckc 450, 300k W Gearbox Of 1400mm 2nd Belt Of Mic, J P Colliery
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_329164_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/141 dated 12.02.2025 |
| Tender Fee | 0 |
| EMD | 5200 |
| Tender Value | - |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341186 |
| Start Date | February 18, 2025 16:30 |
| End Date |
Expired
28/02/2025
Expired 593 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Installation 2 300kw 1400mm 2nd belt conveyor complete drive head in main incline including all associated job at mic, jhanjra project colliery
Installation 2 300kw 1400mm 2nd belt conveyor complete drive head in main incline including all associated job at mic, jhanjra project colliery
Read moreProcurement of complete gearbox along with spares of new allen berry works make worm reduction gearbox type and size sua 6 ratio 60 1 installed at 4x210 mw chp i sgtps mppgcl birsinghpur
Procurement of complete gearbox along with spares of new allen berry works make worm reduction gearbox type and size sua 6 ratio 60 1 installed at 4x210 mw chp i sgtps mppgcl birsinghpur
Read moreTransportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Transportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Read moreFabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery
Fabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery
Read moreFabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery
Fabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery
Read moreTransportation and replacement of bottom roller by fitting of bottom pressure roller along with fitting of pressure roller hanger in 1400mm 2nd belt conveyor and transportation of old bottom rollers at surface of mic, jhanjra project colliery.
Transportation and replacement of bottom roller by fitting of bottom pressure roller along with fitting of pressure roller hanger in 1400mm 2nd belt conveyor and transportation of old bottom rollers at surface of mic, jhanjra project colliery.
Read moreRemoving old iron structure such as belt structure, 1200mm and 1000 mm belt piece, gearbox, coupling etc. from 500mh main line between 500mh pit bottom to rok along 500mmh main line at moonidih colliery, w j area
Removing old iron structure such as belt structure, 1200mm and 1000 mm belt piece, gearbox, coupling etc. from 500mh main line between 500mh pit bottom to rok along 500mmh main line at moonidih colliery, w j area
Read moreof your Industry type