Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transportation And Fitting Of One Nos. 300k W Gear Box, One No. 6.6k V 300k W Motor And Replacement Of One Fgc 11 Geared Coupling In Drum Side Of 1400 3rd Belt Conveyor In Main Incline At Mic, Jhanjra Project Colliery
|
| Description |
Transportation And Fitting Of One Nos. 300k W Gear Box, One No. 6.6k V 300k W Motor And Replacement Of One Fgc 11 Geared Coupling In Drum Side Of 1400 3rd Belt Conveyor In Main Incline At Mic, Jhanjra Project Colliery
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_336006_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/25-26/10 dated 17.05.2025 |
| Tender Fee | 0 |
| EMD | 2600 |
| Tender Value | - |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348304 |
| Start Date | May 24, 2025 16:30 |
| End Date |
Expired
03/06/2025
Expired 502 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
Read moreRepairing of five nos. conveyor pulley (pcc 36a, pcc 58a, pcc 50a, pcc 51a, pcc 59a) of different size and two nos. conveyor drum (pcc 128, pcc 112) of mic, jhanjra project colliery
Repairing of five nos. conveyor pulley (pcc 36a, pcc 58a, pcc 50a, pcc 51a, pcc 59a) of different size and two nos. conveyor drum (pcc 128, pcc 112) of mic, jhanjra project colliery
Read moreReplacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Replacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Read moreDismantling, repairing and refitting of shaft of drive drum of main incline conveyor of shyamsundarpur colliery under bankola area
Dismantling, repairing and refitting of shaft of drive drum of main incline conveyor of shyamsundarpur colliery under bankola area
Read moreTransportation and changing of one no. driven drum, one no. pressure drum, two nos. fgc-11 geared coupling, bearing change of drive drum, driven drum, pressure drum, and discharge drum of 1400mm 2nd belt conveyor in main incline at mic, jhanjra proje
Transportation and changing of one no. driven drum, one no. pressure drum, two nos. fgc-11 geared coupling, bearing change of drive drum, driven drum, pressure drum, and discharge drum of 1400mm 2nd belt conveyor in main incline at mic, jhanjra proje
Read moreTransportation and changing of one no, driven drum, one no, pressure drum, two nos, fgc-11 geared coupling bearing change of drive drum, driven drum, pressure drum and discharge drum of 1400mm 2nd belt conveyor in main incline at mic, jhanjra projec
Transportation and changing of one no, driven drum, one no, pressure drum, two nos, fgc-11 geared coupling bearing change of drive drum, driven drum, pressure drum and discharge drum of 1400mm 2nd belt conveyor in main incline at mic, jhanjra projec
Read moreInstallation 2 300kw 1400mm 2nd belt conveyor complete drive head in main incline including all associated job at mic, jhanjra project colliery
Installation 2 300kw 1400mm 2nd belt conveyor complete drive head in main incline including all associated job at mic, jhanjra project colliery
Read moreFabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery
Fabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery
Read moreFabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery
Fabrication of one no. 1400mm loop take-up trolley and installation of loop take trolley of 1400 1st belt conveyor in main incline at mic jhanjra project colliery
Read moreTransportation and changing of one nos. gear box and one no. motor, replacement of worn out fgc-11 geared coupling of both the drums of 1400 3rd belt conveyor in main incline at mic, jhtransportation and changing of one nos. geaanjra project colliery
Transportation and changing of one nos. gear box and one no. motor, replacement of worn out fgc-11 geared coupling of both the drums of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Read moreof your Industry type