Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Es Em Ii Annual Maintenance Of Lt Switchgear Lt Breakers Modules Bus Bars And Isolators During The Overhaul Period Of 24 25 At Ahp Stage Ii
|
| Description |
Ttps Es Em Ii Annual Maintenance Of Lt Switchgear Lt Breakers Modules Bus Bars And Isolators During The Overhaul Period Of 24 25 At Ahp Stage Ii
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_463329_1 |
|
Reference Number |
CE/SE/ES /TTPS /No.217/2024-25 |
| Tender Fee | 0 |
| EMD | 400 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=550638 |
| Start Date | July 16, 2024 19:30 |
| End Date |
Expired
31/07/2024
Expired 806 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mechii ahp unit iii cleaning of ash slurry sluice sump of unit iii during the forthcoming annual overhaul
Ttps mechii ahp unit iii cleaning of ash slurry sluice sump of unit iii during the forthcoming annual overhaul
Read moreTtps mech ii ahp unit iii annual overhauling works cleaning of ash water pump house sump during the forthcoming annual overhaul
Ttps mech ii ahp unit iii annual overhauling works cleaning of ash water pump house sump during the forthcoming annual overhaul
Read moreTtps mechii ahp unitiii fabrication and assembling of feed gate housing enclosure for unit iii bah system during the forthcoming annual overhaul
Ttps mechii ahp unitiii fabrication and assembling of feed gate housing enclosure for unit iii bah system during the forthcoming annual overhaul
Read moreTtps operation circle cad unit v annual maintenance in cooling water pump house ii lt 415v ac switch gear bus b modules and breaker during the forthcoming overhaul period 2026 to 2027
Ttps operation circle cad unit v annual maintenance in cooling water pump house ii lt 415v ac switch gear bus b modules and breaker during the forthcoming overhaul period 2026 to 2027
Read moreTtps operation circle cad unit iv annual maintenance in cooling water pump house ii lt 415v ac switch gear bus a modules, breaker and bus coupler during the forthcoming overhaul period 2026 to 2027
Ttps operation circle cad unit iv annual maintenance in cooling water pump house ii lt 415v ac switch gear bus a modules, breaker and bus coupler during the forthcoming overhaul period 2026 to 2027
Read moreTtps mech ii ahp unit iii annual overhauling works of valves replacement of corroded pipes of sea water booster pumps during the forthcoming annual overhaul
Ttps mech ii ahp unit iii annual overhauling works of valves replacement of corroded pipes of sea water booster pumps during the forthcoming annual overhaul
Read moreTtps mechii ahp unitiii rubber lining of ms pipes and fittings in sea water booster pump and ash water pumps during the forthcoming annual overhaul
Ttps mechii ahp unitiii rubber lining of ms pipes and fittings in sea water booster pump and ash water pumps during the forthcoming annual overhaul
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreTtps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Read moreTtps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv 433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2026 to 2027 in acwph
Ttps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv 433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2026 to 2027 in acwph
Read moreof your Industry type