Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Es Em Ii Annual Maintenance Of Lt Switchgear Lt Breakers Modules Bus Bars And Isolators During The Overhauling Period Of 2024 25 At Esp Iii
|
| Description |
Ttps Es Em Ii Annual Maintenance Of Lt Switchgear Lt Breakers Modules Bus Bars And Isolators During The Overhauling Period Of 2024 25 At Esp Iii
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_463281_1 |
|
Reference Number |
CE/SE/ES /TTPS /No.213/2024-25 |
| Tender Fee | 0 |
| EMD | 200 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=550581 |
| Start Date | July 16, 2024 19:30 |
| End Date |
Expired
31/07/2024
Expired 804 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps es circle em ii retrofitting of 3 nos 3200 amps lt air circuit breakers in esp i ii iii
Ttps es circle em ii retrofitting of 3 nos 3200 amps lt air circuit breakers in esp i ii iii
Read moreTtps es circle em ii erection and commissioning of 2 nos esp high voltage rectifier transformer in esp iii at unit iii
Ttps es circle em ii erection and commissioning of 2 nos esp high voltage rectifier transformer in esp iii at unit iii
Read moreS.55 nctps ii es circle em ii dn sdn iii charges towards rewinding of 25 nos of 37kw/0.5hp, 0415v 1390rpm rated lt rapping motors in unit i and ii esp system
S.55 nctps ii es circle em ii dn sdn iii charges towards rewinding of 25 nos of 37kw/0.5hp, 0415v 1390rpm rated lt rapping motors in unit i and ii esp system
Read moreTtps em1 retrofitting of 5 nos lt acb edo 3 pole 1250 amps breakers with retrofit kit for replacement of the existing old breakers in unit iii 6 6 kv control room and dg set
Ttps em1 retrofitting of 5 nos lt acb edo 3 pole 1250 amps breakers with retrofit kit for replacement of the existing old breakers in unit iii 6 6 kv control room and dg set
Read moreRewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Rewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Read moreTtps operation circle cad unit v annual maintenance in cooling water pump house ii lt 415v ac switch gear bus b modules and breaker during the forthcoming overhaul period 2026 to 2027
Ttps operation circle cad unit v annual maintenance in cooling water pump house ii lt 415v ac switch gear bus b modules and breaker during the forthcoming overhaul period 2026 to 2027
Read moreTtps operation circle cad unit iv annual maintenance in cooling water pump house ii lt 415v ac switch gear bus a modules, breaker and bus coupler during the forthcoming overhaul period 2026 to 2027
Ttps operation circle cad unit iv annual maintenance in cooling water pump house ii lt 415v ac switch gear bus a modules, breaker and bus coupler during the forthcoming overhaul period 2026 to 2027
Read moreTtps es circle em ii dismantling of wornout mono rail structuals supports and fabrication erection of new structuals supports in seal air fan motor and id pa fan motors hoist maintenance platform in unit i ii iii
Ttps es circle em ii dismantling of wornout mono rail structuals supports and fabrication erection of new structuals supports in seal air fan motor and id pa fan motors hoist maintenance platform in unit i ii iii
Read moreTtps es circle em ii dismantling the existing old pedestal type pa fan motor and erection and commissioning of newly procured 6.6 kv 900kw squirrel cage antifriction primary air fan motor after bed modification in unit i pa fan location 1b
Ttps es circle em ii dismantling the existing old pedestal type pa fan motor and erection and commissioning of newly procured 6.6 kv 900kw squirrel cage antifriction primary air fan motor after bed modification in unit i pa fan location 1b
Read moreTtps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv 433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2026 to 2027 in acwph
Ttps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv 433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2026 to 2027 in acwph
Read moreof your Industry type