Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pmc Servicaes For Construction Of 2 Lane Bypass Of Karnaprayag 4km Bypass With Tunnels 2.89 Km Panduwakhal Bypass 10km With Tunnels 1.795 Km Kainchidham Bypass 1.9km With 0.325 Km Tunnel Bageshwar Bypass 2.38 Km With 1.1 Km Tunnels
|
| Description |
Pmc Servicaes For Construction Of 2 Lane Bypass Of Karnaprayag 4km Bypass With Tunnels 2.89 Km Panduwakhal Bypass 10km With Tunnels 1.795 Km Kainchidham Bypass 1.9km With 0.325 Km Tunnel Bageshwar Bypass 2.38 Km With 1.1 Km Tunnels
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_871944_1 |
|
Reference Number |
RO/UK/2025-26/PMC/NH109_309A |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | |
| Place | Karnprayag Panduwakhal Kainchidhaam Bypass |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=916601 |
| Start Date | August 06, 2025 22:30 |
| End Date |
Expired
03/10/2025
Expired 275 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of bageshwar bypass including 2- lane tunnel with approaches across the bageshwar hills in market area (existing km stone 130 to existing km stone 136 of nh-309a) total length of bypass 2.2 km including 1.05 km tunnel) in the state of uk
Construction of bageshwar bypass including 2- lane tunnel with approaches across the bageshwar hills in market area (existing km stone 130 to existing km stone 136 of nh-309a) total length of bypass 2.2 km including 1.05 km tunnel) in the state of uk
Read moreProject management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.
Project management consultancy services for design and supervision of construction of 2 lane road ing from dhalwala km 228.800 of tunnel to km 235.800 of nh 7 (length-7.0 kms) with five tunnels of length 750m,100m,100m,200m and 300m.
Read moreScr construction organization - engineering, procurement and construction (epc) - contract for construction of new bi-directional twin tunnels on di (1) main tunnel of 6.70 km long each (6.05 km main tunnel length 0.65 km main cut & cover length and 1.8 km approach length for main tunnel) (2) evacuation tunnel of 6.70 km long each (6.05 km evacuation tunnel length 0.65 km evacuation cut & cover length and 1.8 km approach length for evacuation tunnel) , total 8.5 kms le
For complete deion and other details, please refer to tender
Read moreExperienced agencies for construction of tunnel t1 tunnel 2 with blt works related to formation on approaches of such tunnels in connection with construction of electrified new bg railway line between mangliyagaon indore to budni stations 198 kms
Experienced agencies for construction of tunnel t1 tunnel 2 with blt works related to formation on approaches of such tunnels in connection with construction of electrified new bg railway line between mangliyagaon indore to budni stations 198 kms
Read moreConsultancy services for authority engineer for supervision of three civil project (i)construction of two lane with paved shoulder for rajgarh bypass from design km 0.000 to km 5.400 and pilani bypass from design km 35.840 to km 43.120 on epc mode.
(ii) construction of two lane fatehpur bypass,mandawa bypass and jhunjhunu bypass on epc mode (iii) construction of balance work 2 lane rob and its existing level crossing no.a-142 at km 1.0 of nh-709 near sadulpur railway station churu on epc mod
Read moreProject management consultancy services for construction of 2 lane bypass at the lohaghat hills in market area start of bypass km 136.325 of nh09 end of bypass km 142 of nh09 and at pithoragarh hills in maret area start of bypass km 197of nh-09 end
Project management consultancy services for construction of 2 lane bypass at the lohaghat hills in market area start of bypass km 136.325 of nh09 end of bypass km 142 of nh09 and at pithoragarh hills in maret area start of bypass km 197of nh09 end
Read moreDpr for kaithlighat to shakral shimla bypass from km 143750 to km 144600 and descoped section of from km 127420 to km 128830 and development of junction at km. 128830 and additional 2 lane tunnel at kandaghat in the state of himachal pradesh
Dpr for kaithlighat to shakral shimla bypass from km 143750 to km 144600 and descoped section of from km 127420 to km 128830 and development of junction at km. 128830 and additional 2 lane tunnel at kandaghat in the state of himachal pradesh
Read moreConstruction of two lane with paved shoulder of ambikapur bypass from design ch. km 373.505 to km 388.700 sitapur bypass from design ch. km 436.030 to km 439.400 and pathalgaon bypass from design ch. km 466.600 to km 469.200 of ambikapur pathalgaon s
Construction of two lane with paved shoulder of ambikapur bypass from design ch. km 373.505 to km 388.700 sitapur bypass from design ch. km 436.030 to km 439.400 and pathalgaon bypass from design ch. km 466.600 to km 469.200 of ambikapur pathalgaon s
Read moreof your Industry type