Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Erection And Dismantling Of 150 Mm Gi/Ms Pipe For Di Of Existing Pipeline Connected With 2000 Gpm Pump For Dewatering Of East Patch Of Sayal D Project.
|
| Description |
Erection And Dismantling Of 150 Mm Gi/Ms Pipe For Di Of Existing Pipeline Connected With 2000 Gpm Pump For Dewatering Of East Patch Of Sayal D Project.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_340112_1 |
|
Reference Number |
PE(EnM)/SYL-D/eTender/25-26/12 |
| Tender Fee | 0 |
| EMD | 9800 |
| Tender Value | |
| Place | Sayal-D Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=352579 |
| Start Date | July 24, 2025 14:30 |
| End Date |
Expired
02/08/2025
Expired 326 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of 1500 mtr, and dismantling of 500 mtr, 150mm(6inch) dia ms/gi pipe and erection of 1500 mtr 200 mm pipeline for di of existing pipe line with extension at birsa project.
Erection of 1500 mtr, and dismantling of 500 mtr, 150mm(6 inch) dia ms/gi pipe and erection of 1500 mtr 200 mm pipeline for di of existing pipe line with extension at birsa project.
Read moreDismantling, erection and laying and repairing of 150 mm and 200 mm dia pipeline on as when required basis during monsoon 2026 at sayal-d project under barka-sayal area.
Dismantling, erection and laying and repairing of 150 mm and 200 mm dia pipeline on as when required basis during monsoon 2026 at sayal-d project under barka-sayal area.
Read moreLaying and erection of 150 mm ms/gi pipeline work at main sump for installation of 01 number 1000 gpm pump of topa project under kuju area.
Laying and erection of 150 mm ms/gi pipeline work at main sump for installation of 01 number 1000 gpm pump of topa project under kuju area.
Read moreProvision of pipeline system with switch room for firefighting at east patch under sayal d project, barka-sayal area.
Provision of pipeline system with switch room for firefighting at east patch under sayal d project, barka-sayal area.
Read moreLaying of 300 meters of 150 mm diameter pipeline along with pipe fittings for installation of pump in 2nd patch of east quarry for dewatering at sayald project.
Laying of 300 meters of 150 mm diameter pipeline along with pipe fittings for installation of pump in 2nd patch of east quarry for dewatering at sayald project.
Read moreErection and laying of 2000mtr, 6 inch dia (150mm) dia pipe line for providing water to east patch of saya-d ocp. from west patch of sayal-d ocp.
Erection and laying of 2000mtr, 6 inch dia (150mm) dia pipe line for providing water to east patch of saya-d ocp. from west patch of sayal-d ocp.
Read moreErection of 1000mtr, 6 inch dia gi pipe line for suction and delivery of 1000gpm pump installed at sayal-d ocp.
Erection of 1000mtr, 6 inch dia gi pipe line for suction and delivery of 1000gpm pump installed at sayal-d ocp.
Read moreFor shifting, dismantling, extension and maintenance of 150mm ms gi pipeline for monsoon works at bhurkunda colliery under barka sayal area
For shifting, dismantling, extension and maintenance of 150mm ms gi pipeline for monsoon works at bhurkunda colliery under barka sayal area
Read moreDismantling and laying of 8 inch dia gi/ms pipe 216 mtr. and 6 inch dia g.i./m.s. pipe 300 mtr. for dewatering of installation, shifting of 2000 gpm pump at karipani mine sump location under sdocm
Dismantling and laying of 8 inch dia gi/ms pipe 216 mtr. and 6 inch dia g.i./m.s. pipe 300 mtr. for dewatering of installation, shifting of 2000 gpm pump at karipani mine sump location under sdocm
Read moreLowering, lifting and installation of 03 nos, pump i.e. 01 no. 1000 gpm and 02 nos. 2000 gpm pump with alignment of pipe 150mm and 200mm dia. ms/gi pipeline at karma ocp under kuju area.
Lowering, lifting and installation of 03 nos, pump i.e. 01 no. 1000 gpm and 02 nos. 2000 gpm pump with alignment of pipe 150mm and 200mm dia. ms/gi pipeline at karma ocp under kuju area.
Read moreof your Industry type