Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Lowering And Fixing Of Three Phase 185mm2 Xlpedwa Cable At Shaft No. 1 At Moonidih Colliery, Wj Area.
|
| Description |
Lowering And Fixing Of Three Phase 185mm2 Xlpedwa Cable At Shaft No. 1 At Moonidih
Colliery, Wj Area.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_289001_1 |
|
Reference Number |
BCCL/WJA/MND/SUR/2023-24/32 |
| Tender Fee | - |
| EMD | 13560 |
| Tender Value | - |
| Place | Office of the Project Officer, Moonidih Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 16, 2023 22:30 |
| End Date |
Expired
28/09/2023
Expired 1114 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of return roller shaft assembly of surface apron feeder (mnd/mamc/01) and skip pocket (mnd/mcnallybharat/0 1 and 02) in vertical section moonidih project, wj area
Repairing of return roller shaft assembly of surface apron feeder (mnd/mamc/01) and skip pocket (mnd/mcnallybharat/0 1 and 02) in vertical section moonidih project, wj area (nos.- 03)
Read moreRepairing/new change of m.s shell and en-24 shaft of 1200 mm belt main belt discharge drum in skip pocket for u.g in vertical section moonidih project wj area. sl.no.mnd/discharge drum/skip pocket/01
Repairing/new change of m.s shell and en-24 shaft of 1200 mm belt main belt discharge drum in skip pocket for u.g in vertical section moonidih project wj area. sl.no.mnd/discharge drum/skip pocket/01
Read moreDismantling of 5 hp motor gear box and fabricated cantrol,material and labour for making,material and labour for disconnecting and removing,supply only bearings suitable for 5 hp,material and labour for servicing of gear box,supply and fixing in replacement of power ac contractor,supply and fixing in replacement of variable,supply and fixing in replacement of heavy duty,supply and fixing in replacement chain,material and labour for maintenance servicing,supply and fixing in replacement three phase,supply laying testing and commissioning,supply and laying of dwc pipe isi marked,supply and fixing 10 mm dia steel string,material and labour pcc,excavation in trenches not exc,returning filling in including spreading,removing excavated soil
Dismantling of 5 hp motor gear box and fabricated cantrol,material and labour for making,material and labour for disconnecting and removing,supply only bearings suitable for 5 hp,material and labour for servicing of gear box,supply and fixing in replacement of power ac contractor,supply and fixing in replacement of variable,supply and fixing in replacement of heavy duty,supply and fixing in replacement chain,material and labour for maintenance servicing,supply and fixing in replacement three phase,supply laying testing and commissioning,supply and laying of dwc pipe isi marked,supply and fixing 10 mm dia steel string,material and labour pcc,excavation in trenches not exc,returning filling in including spreading,removing excavated soil
Read moreCleaning of spillage accumulated muck debris coal at shaft no. ii and middle x cut, 500mh at moonidih colliery wj area
Cleaning of spillage accumulated muck debris coal at shaft no. ii and middle x cut, 500mh at moonidih colliery wj area
Read moreCleaning accumulated muck/ debries at lodgment no.i at 500mh at moonidih colliery, wj area
Cleaning accumulated muck/ debries at lodgment no.i at 500mh at moonidih colliery with pick and loading on mine car by carrying manually up to a distance of 50 m
Read moreComplete rewinding and repairing of three (03) motors 110 kw, 550v 1470 rpm of moonidih workshop, moonidih colliery, wj area. sl.no. mnd/cws/110kw/01 and 10 or mnd/ccs/110kw/04
Complete rewinding and 
 repairing of three (03) 
 motors 110 kw, 550v 
 1470 rpm of moonidih 
 workshop, moonidih 
 colliery, wj area. 
 sl.no. 
 mnd/cws/110kw/01 
 and 10 or 
 mnd/ccs/110kw/04
Read moreComplete rewinding and repairing of 110kw, 550v,1470 rpm motor stator of moonidih workshop, moonidih colliery, wj area (sl.no.mnd/cws/110kw/ 04,09,15,16 and 18)
Complete rewinding and 
 repairing of 110kw, 
 550v,1470 rpm motor 
 stator of moonidih 
 workshop, moonidih 
 colliery, wj area 
 (sl.no.mnd/cws/110kw/ 
 04,09,15,16 and 18)
Read moreNew change of shaft of rotor 1150kw for polish pump motor of moonidih workshop, wj area. sl.no. 641211968
New change of shaft of rotor 1150kw for polish pump motor of moonidih workshop, wj area. sl.no. 641211968
Read moreComplete rewinding and repairing of 90 kw, 550v 1440 rpm, motor stator of moonidih workshop, moonidih colliery, wj area sl.no.mnd/cws/mt90kw/ 01 and 03
Complete rewinding and 
 repairing of 90 kw, 550v 
 1440 rpm, motor stator of 
 moonidih workshop, 
 moonidih colliery, wj area 
 sl.no.mnd/cws/mt90kw/
 01 and 03
Read moreNew change of shaft of rotor 150 kw motor of beacon pumps motor shaft of moonidih workshop, wj area. sl.no. beacon/150kw/01
Repairing of shaft of rotor 150 kw motor of beacon pump motor shaft of moonidih workshop, wj area. sl.no. beacon/150kw/01.
Read moreof your Industry type