Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening And Upgradation Work Of Contact Road Bhandevra Road Km 0/00 To 0/600 And Relawan To Jaitpura Road Km 0/0 To 6/00.
|
| Description |
Strengthening And Upgradation Work Of Contact Road Bhandevra Road Km 0/00 To 0/600 And Relawan To Jaitpura Road Km 0/0 To 6/00.
|
| Organisation | PWD - CE AND AS | State Govt. and UT |
| Tender Id | 2024_CEPWD_430107_1 |
|
Reference Number |
SE PWD CIRCLE BARAN NITNO-03/2024-25 |
| Tender Fee | 4000 |
| EMD | 7.6 Lakh |
| Tender Value | - |
| Place | BARAN |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=773303 |
| Start Date | November 06, 2024 00:00 |
| End Date |
Expired
26/11/2024
Expired 690 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Renovation work of the road from km 0/00 to 0/600 at vedji tapri
Renovation work of the road from km 0/00 to 0/600 at vedji tapri
Read moreAnnual maintenance plan on chaurun to batali road km 0/00 to 2/600
Providing and laying bituminous concrete 25mm thick in km 1/00 to 2/600 under pmgsy with paver finisher) (drrp no-hp-03-03 - vr0100)
Read moreA/r and m/o on brahman majra link road in km 0/0 to 1/600 (sh p/l patch work b.c in km 0/00 to 1/600).
A/r and m/o on brahman majra link road in km 0/0 to 1/600 (sh p/l patch work b.c in km 0/00 to 1/600).
Read moreAnnual surfacing on (i) link road from hiranagar petrol pump to jablog km. 0/00 to 0/750 (portion km. 0/00 to 0/750) (ii) link road from banuti to mansa mata temple in km. 0/00 to 0/600(iii) link road to village panti in km. 0/00 to 0/645
Providing and laying 25 mm thick bituminous concrete along with p/l of hot applied thermo plastic compound 2.50 mm thick for edge line under amp 2026-27 addl. km.
Read moreReconstruction of canals narendranagar tehri garhwal cm dec 494 2024 reach 0 00 km to 0 600 km lawa minor
Reconstruction of canals narendranagar tehri garhwal cm dec 494 2024 reach 0 00 km to 0 600 km lawa minor
Read moreC/o balance work of 600 metre link road from chamral chowk to i.t.i darod in g.p. chamral km 0/00 to 1/600.
C/o b/wall, cc pavement and v-shape drain in km 0/00 to 1/600).
Read moreStrengthening and black toping to padali to pawarvasti road (vr-84) km 0/00 to 4/00 at padali, tal-jamkhed, dist-ahilyanagar
Strengthening and black toping to padali to pawarvasti road (vr-84) km 0/00 to 4/00 at padali, tal-jamkhed, dist-ahilyanagar
Read moreExpansion bellow,rectifier metallic type l18 distbld,cable electric j singl,lop safety sensor,sensor hcht,pad 3ywa 600 0 285,starter 12v ixc kr 03 034 01 0 00,alternator 12v ixc kr 03 148 05 0 00,ac frequncey meter ixc kr 03 963 740 0 00,rotating diode assy ixc kr 03 3h 812 41 0 00
Expansion bellow,rectifier metallic type l18 distbld,cable electric j singl,lop safety sensor,sensor hcht,pad 3ywa 600 0 285,starter 12v ixc kr 03 034 01 0 00,alternator 12v ixc kr 03 148 05 0 00,ac frequncey meter ixc kr 03 963 740 0 00,rotating diode assy ixc kr 03 3h 812 41 0 00
Read moreT.p.t.s road km. 0/00 to 11/00 (sh- repair of pot holes in rds in km. 0/00 to 2/00 and 9/00 to 11/00) under pdna 2025
T.p.t.s road km. 0/00 to 11/00 (sh- repair of pot holes in rds in km. 0/00 to 2/00 and 9/00 to 11/00) under pdna 2025
Read moreof your Industry type