Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Consultancy Services For Authoritys Engineer For Supervision Of Construction Of Four Lane Of Chausa Buxar Bypass From Km 45.000 To Km 65.915 (Package 2) Of Nh 319 A In The State Of Bihar On Epc Mode.
|
Description |
Consultancy Services For Authoritys Engineer For Supervision Of Construction Of Four Lane Of Chausa Buxar Bypass From Km 45.000 To Km 65.915 (Package 2) Of Nh 319 A In The State Of Bihar On Epc Mode.
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | Chausa Buxar Bypass |
Link |
AAAAAAAAAA Login to view |
Start Date | June 20, 2025 22:30 |
End Date |
27/06/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreConsultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Read moreConsultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu
Read moreConsultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu
Read moreRehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).
Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type