Tender Details
Particulars | Details |
---|---|
Title |
Wbphed/Ee/Maad/N Ie T 03(3rd Call) Of 2023 2024 Sl No. 02
|
Description |
Construction Of 450 Cum Capacity 20 Mtr. Staging Height Rcc Over Head Reservoir As Per Departmental Design And Drawing Including Pipe Connection, Soil Investigation For Nabinagar Piped Water Supply Scheme At Kaliachak I Block Under Maad
|
Organisation | Government of West Bengal |
Tender Id | 2023_PHED_555163_2 |
Reference Number |
WBPHED/EE/MAAD/NIeT _03(3rd Call) of 2023-2024 |
Tender Fee | |
EMD | 3.28 Lakh |
Tender Value | |
Place | EXECUTIVE ENGINEER, MAAD,DOULATPUR, MALDA |
Link | https://wbtenders.gov.in |
Start Date | August 10, 2023 16:30 |
End Date |
05/09/2023 ( Expired 626 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewSupply, delivery and installation overhead pole at para water supply scheme (intake site) and other allied works under pmd, phe dte.
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreUpgradation of road from mrlo1-nh-o8 (peratia bazar) to garjee bazar (nh) via kalaban bazar, package no- tr-06-03 p3 (length. 11.04 km) under matabari block (3rd call) dnit no 28/eo/pmgsy-iii batch-i, 2023- 24/trrda/2025-26
Pmgsy iii works
Read moreUpgradation of road rrom mrl07-amarpur udaipur road near gamaria para to lovestory bazar road via gamaria adc office, package no-tr-06-02 p3 (length-5.309 km) under matabariblock. dnit no 27/eo/pmgsy-iii batch-i, 2023- 24)/trrda/2025-26
Pmgsy iii works
Read moreConstruction of stage at ward no. 01. 02, 03, 04, 07, 08, 09, 10, 12, 13
Construction of stage at ward no. 01. 02, 03, 04, 07, 08, 09, 10, 12, 13&#x0d under nagar parishad nowrozabad.&#x0d
Read more(molik nidhi) construction of teen shed at park line no.02 at zone 05 ward 12.file no.108/25x3/3.
(molik nidhi) construction of teen shed at park line no.02 at zone 05 ward 12.file no.108/25x3/3.
Read moreExecuting work of 66 kv line for stringing of 2nd circuit of 66 kv line from 66 kv substation amloh to 66 kv substation bhadson planning no 80 cz 2023 24 annexure e rdss work
Executing work of 66 kv line for stringing of 2nd circuit of 66 kv line from 66 kv substation amloh to 66 kv substation bhadson planning no 80 cz 2023 24 annexure e rdss work
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreConstruction of drain in gali no. 01 and 02 at shiv colony ward no. 32
Construction of drain in gali no. 01 and 02 at shiv colony ward no. 32
Read moreof your Industry type