Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Work From Km 32.200 To 50.200 Of Jais Mohanganj Inhauna Rudauli Road (Major District Road)
|
| Description |
Strengthening Work From Km 32.200 To 50.200 Of Jais Mohanganj Inhauna Rudauli Road (Major District Road)
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_CEUFZ_863690_1 |
|
Reference Number |
3417/1Com.Sul.Amethi Circle/23 Date 16-11-2023 |
| Tender Fee | 2714 |
| EMD | 42 Lakh |
| Tender Value | - |
| Place | S. E., Sultanpur-Amethi Circle, PWD, Sultanpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | November 21, 2023 16:30 |
| End Date |
Expired
06/12/2023
Expired 1044 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district ayodhya, construction of road from bhelsar-rudauli-inhauna road to shri suryabaksh singh mahavidyalaya via ancient rechheshwar mahadev temple, lot no 4
Under district ayodhya, construction of road from bhelsar-rudauli-inhauna road to shri suryabaksh singh mahavidyalaya via ancient rechheshwar mahadev temple, lot no 4
Read moreMajor repair, rehabilitation and strengthening of aerator structure at pps3, bawana.
Major repair, rehabilitation and strengthening of aerator structure at pps3, bawana.
Read moreOhe modification in connection with rebuilding / strengthening of major bridges no. 1020, 1022, 1051, 1038 & 1008 in khodiyar - mahesana section
Ohe modification in connection with rebuilding / strengthening of major bridges no. 1020, 1022, 1051, 1038 & 1008 in khodiyar - mahesana section
Read moreCcg - vr section - strengthening of major & importent br. no. 20 on up & dn through & local lines under sse (p. way) andheri section.
Ccg - vr section - strengthening of major & importent br. no. 20 on up & dn through & local lines under sse (p. way) andheri section.
Read moreBalance work for strengthening of major bridge approaches in spwi-vnwi section in connection with ahmednagar-beed-parli vaijnath new b.g. line project.
Balance work for strengthening of major bridge approaches in spwi-vnwi section in connection with ahmednagar-beed-parli vaijnath new b.g. line project.
Read moreStrengthening of inspection path on left side bund of 12l minor of 19th mangapuram major of nsp lal bahadur shastri canal near vallapuram village, mudigonda mandal, khammam district. (invited under earmarked works- scs are only eligible to participate)
Strengthening of inspection path on left side bund of 12l minor of 19th mangapuram major of nsp lal bahadur shastri canal near vallapuram village, mudigonda mandal, khammam district. (invited under earmarked works- scs are only eligible to participate)
Read moreMajor maintenance through strengthening and overlay of the existing highway from km.38.000 (guduvancherry) to km.51.300 (mahindra city) on tambaram to tindivanam section of nh 32 (old nh 45) in the state of tamil nadu on item rate (percentage) basis
Major maintenance through strengthening and overlay of the existing highway from km.38.000 (guduvancherry) to km.51.300 (mahindra city) on tambaram to tindivanam section of nh 32 (old nh 45) in the state of tamil nadu on item rate (percentage) basis
Read moreStrengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o
Strengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o
Read moreStrengthening work from km 32.200 to 50.200 of jais mohanganj inhauna rudauli road (major district road)
Strengthening work from km 32.200 to 50.200 of jais mohanganj inhauna rudauli road (major district road)
Read moreRepair work of small bridge located at km 23 of jais mohanganj inhauna rudauli road
Repair work of small bridge located at km 23 of jais mohanganj inhauna rudauli road
Read moreof your Industry type