Tender Details
Particulars | Details |
---|---|
Title |
Manual Complete Track Renewal (P) Work At Balance Location (Isolated Patches) For Around 13.5 Tkm ( Track Km) Including Replacement /Ion Of 13 Of Points And Crossing Between Km 693/000 To Km 739/800 Of Udupi Thokur Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77466542 |
Reference Number |
KR-KW-OL-W-2024-58-CB |
Tender Fee | 0 |
EMD | 4.48 Lakh |
Tender Value | |
Place | Navi Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77466542/viewNitPdf_4718503.pdf |
Start Date | September 25, 2024 20:53 |
End Date |
17/10/2024 ( Expired 212 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Salem division- provision of mini ips at leftover interlocked lc gates over salem division 1. lc no. 121d-km 390a/22-24 at erode section between cauvery-erode 2. lc no. 3-km 2/9-11 at podanur section between irugur- peelamedu 3. lc no. 12-km 13/5-7 at coimbatore section between coimbatore north-peelamedu 4. lc no.4-km 6/800-900,8/000-100 at cbe section between coimbatore north-karamadai 5. lc no. 54-km 103/000-100 at karur section between lalapet-kulithalai 6. lc no. 83-km135/500-600 a
For complete deion and other details, please refer to tender
Read moreSalem division- provision of mini ips at leftover interlocked lc gates over salem division 1. lc no. 121d-km 390a/22-24 at erode section between cauvery-erode 2. lc no. 3-km 2/9-11 at podanur section between irugur- peelamedu 3. lc no. 12-km 13/5-7 at coimbatore section between coimbatore north-peelamedu 4. lc no.4-km 6/800-900,8/000-100 at cbe section between coimbatore north-karamadai 5. lc no. 54-km 103/000-100 at karur section between lalapet-kulithalai 6. lc no. 83-km135/500-600 a
For complete deion and other details, please refer to tender
Read moreSw i : yelahanka - rajanakunte : pro. construction of goomties at lc 20 between km 23/000-100. sw ii : construction of rcc drain for a length of 2160m in connection with the work of bengaluru -sampige road and bangalore - dharmavaram sec: through turnout renewal (ttr) of existing curved switch and cms crossing with 60 kg tws and 60 kg weldable crossing - 1in12 - total : 48 nos in sbc-spgr section in aden/yeswanthpur section and through ballast recoupment (tbr) of points and crossings - 13 nos
For complete deion and other details, please refer to tender
Read moreBangalore - mysore section: construction of rrm drain and ballast retaining wall 1000m in connection with the work of complete track renewal (ctr(p)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in sse/p.way/kgi section. maintenance period is 6 months or one monsoon period whichever is later
For complete deion and other details, please refer to tender
Read moreBangalore - mysore section: complete track renewal (ctr(p)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in sse/p.way/kengeri section.
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : sw i : complete track renewal (p) of existing 60kg rails on 60kg psc with 60kg 90 uts rails on 60 kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn and 56/134-58/100 up between oddarahalli (orh) - thondebhavi (tdv) station in sse/pway/hup section. sw ii : penukonda-satya sai prashanthi nilayam-dharmavaram section : trr(p) of existing 52kg rails with 60kg rails for a length of 9 km from 19/000-19/500, 20/500-24/200, 24/200-26/000 and 27/000-30/000 sl. sw i
For complete deion and other details, please refer to tender
Read moreManual complete track renewal (p) work in point & crossing between km 515/000 to km 568/000 of harwada - honnasection under the jurisdiction of assistant engineer, madgaon in karwar region over konkan railway in karnataka state
For complete deion and other details, please refer to tender
Read moreManual complete track renewal (p) work in tunnels between km 515/000 to km 568/000 of harwada - honnasection (ankola, bargi and mirjan tunnels) under the jurisdiction of assistant engineer, madgaon in karwar region over konkan railway in karnataka state cb 2024-25
For complete deion and other details, please refer to tender
Read moreManual complete track renewal (p) work at balance location (isolated patches) for around 13.5 tkm ( track km) including replacement /ion of 13 of points and crossing between km 693/000 to km 739/800 of udupi-thokur section.
For complete deion and other details, please refer to tender
Read moreBalance work of through fitting renewal in patna-gaya section at up line km 3.16-4.98, 17.90-19.20, 65.20-67.394 and dn line km 2.489-4.98 & 5.22-7.40 (total = 9.977 tkm), complete track renewal (ctr/p) work by pqrs between pnbe-gaya section of aden/jhd. up 85.55-86.85 = 1.30 tkm & up: 89.20 - 90.80 = 1.60tkm & through ballast renewal (tbr) work at km 12.80 to 14.30 in up line and km 15.00 to 15.53, km 17.42 to 19.42,km 22.30 to 22.60 km 27.70 to 28.10, km 30.00 to 44.00 & 7
For complete deion and other details, please refer to tender
Read moreof your Industry type