Particulars | Details |
---|---|
Title |
Repair Work Of Access Road Leading To The Bund Of Khandala Minor Irrigation Tank Under Bhusawal Section
|
Description |
Repair Work Of Access Road Leading To The Bund Of Khandala Minor Irrigation Tank Under Bhusawal Section
|
Organisation | CE Tapi Irrigation Development Corporation Jalgaon | State Govt. and UT |
Tender Id | 2024_TIDC_1115220_1 |
Reference Number |
E Tender No 07/03 |
Tender Fee | 2860 |
EMD | 14000 |
Tender Value | |
Place | Khandala |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1947338 |
Start Date | October 14, 2024 15:40 |
End Date |
21/10/2024 ( Expired 210 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreReconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreof your Industry type