Tender Details

Particulars Details
Title
Servicing Replacement Of Blade Seal And Spring Seal Assembly Of Hot Air Gates And Dampers Of All Mills Of Unit No. 6, 2x250 Mw, C Tps, Parichha During Unit 6 Short Shut Down
Description
Servicing Replacement Of Blade Seal And Spring Seal Assembly Of Hot Air Gates And Dampers Of All Mills Of Unit No. 6, 2x250 Mw, C Tps, Parichha During Unit 6 Short Shut Down
Organisation UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT
Tender Id 2024_RVUNL_974245_1
Reference
Number
NPAR/C/OMC2/BMD2/6000006755_00
Tender Fee 590
EMD 3500
Tender Value
Place PTPP, PARICHHA
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1707039
Start Date November 15, 2024 19:30
End Date

29/11/2024 ( Expired 196 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Capital overhauling of turbine and generator set mandatory optional work as per scope of work of tender specification of unit 6 2x250 mw ptpp parichha

Capital overhauling of turbine and generator set mandatory optional work as per scope of work of tender specification of unit 6 2x250 mw ptpp parichha

Read more
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26

Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26

Read more
Supply of air pre heaters seals complete assembly with seal tabs diaphragm seals and holding strips for aph unit i ii and iv 6 items

Supply of air pre heaters seals complete assembly with seal tabs diaphragm seals and holding strips for aph unit i ii and iv 6 items &amp#x0d

Read more
Overhauling of cmrh system and its other associated work of unit no. 6 of 2x250 mw ctps, parichha during overhauling of unit 6

Overhauling of cmrh system and its other associated work of unit no. 6 of 2x250 mw ctps, parichha during overhauling of unit 6.

Read more
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.

Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.

Read more
Overhauling of 02 nos. air pre-heater, reversal and replacement of baskets, replacement of coal compartment assembly and other associated works of boiler required during capital overhauling of unit6, 2x250mw, ctps, parichha, jhansi

Overhauling of 02 nos. air pre-heater, reversal and replacement of baskets, replacement of coal compartment assembly and other associated works of boiler required during capital overhauling of unit6, 2x250mw, ctps, parichha, jhansi

Read more
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs insulation repairing turbine valves and turbine of unit 5 6 2x250 mw ptpp parichha

Thermal insulation of steam lines feed water lines lphs hphs valves nrvs insulation repairing turbine valves and turbine of unit 5 6 2x250 mw ptpp parichha

Read more
Providing assistance for eot crane hoist and light during oh unit no 6

Providing prive and breakdown maintenance support for eot crane , hoists installed in different areas of 2x250 mw and providing assistance for additional power supply support to all working division of ctps parichha during overhauling of unit no

Read more
Overhauling of various capacities lt motors and switchgear of unit #6

Overhauling of various capacities lt motors ranging from &amp#x0d fractional kw to 170 kw of 0.4 kv/220 v dc and 0.4 kv lt &amp#x0d switchgears of unit 6 bop during proposed overhauling of unit &amp#x0d no. 6 in 2x250 mw, ptpp parichha jhansi

Read more
Painting of actuators at site and panels in dcs room ups, repairing of lock of panels in dcs room etc. and overhauling and servicing of drain/ isolating valve, manifold, impulse lines in oh unit no. 6, 2x250 mw, ptpp, parichha

Painting of actuators at site and panels in dcs room ups, repairing of lock of panels in dcs room etc. and overhauling and servicing of drain/ isolating valve, manifold, impulse lines in oh unit no. 6, 2x250 mw, ptpp, parichha

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise