Particulars | Details |
---|---|
Title |
Servicing Replacement Of Blade Seal And Spring Seal Assembly Of Hot Air Gates And Dampers Of All Mills Of Unit No. 6, 2x250 Mw, C Tps, Parichha During Unit 6 Short Shut Down
|
Description |
Servicing Replacement Of Blade Seal And Spring Seal Assembly Of Hot Air Gates And Dampers Of All Mills Of Unit No. 6, 2x250 Mw, C Tps, Parichha During Unit 6 Short Shut Down
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id | 2024_RVUNL_974245_1 |
Reference Number |
NPAR/C/OMC2/BMD2/6000006755_00 |
Tender Fee | 590 |
EMD | 3500 |
Tender Value | |
Place | PTPP, PARICHHA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1707039 |
Start Date | November 15, 2024 19:30 |
End Date |
29/11/2024 ( Expired 222 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of spares of tg coupling bolts, pedestal, turbine bearing and hp casing assembly for tmd, 2x250 mw ptpp parichha for o/h unit - 6
Supply of spares of tg coupling bolts, pedestal, turbine bearing and hp casing assembly for tmd, 2x250 mw ptpp parichha for o/h unit - 6
Read moreTtps mech ii ahp replacement of regular make up jetting assembly connected pipe lines flushing header assembly overhauling of valves cleaning and welding of seal trough in unit iii bah during annual overhaul 2025 26
Ttps mech ii ahp replacement of regular make up jetting assembly connected pipe lines flushing header assembly overhauling of valves cleaning and welding of seal trough in unit iii bah during annual overhaul 2025 26
Read moreStrengthening by repairing and jacketing of discharge chute of rc feeder of mill xrp-903 other associated work of unit no. 6 of 2x250mw, c tps, parichha jhansi. (45 days)
Strengthening by repairing and jacketing of discharge chute of rc feeder of mill xrp-903 other associated work of unit no. 6 of 2x250mw, c tps, parichha jhansi. (45 days)
Read moreFabrication and assembly of coal mill hot primary air control damper for boiler of 1x500 mw unit at sgtps mppgcl birsinghpur
Fabrication and assembly of coal mill hot primary air control damper for boiler of 1x500 mw unit at sgtps mppgcl birsinghpur
Read moreProcurement of different spring seal shim for esp il and ol duct guillotine gate and bulb seal for hot air and cold air damper and gate for unit 5 and 6 oh under bmd,stps
Procurement of different spring seal shim for esp il and ol duct guillotine gate and bulb seal for hot air and cold air damper and gate for unit 5 and 6 oh under bmd,stps
Read moreOverhauling of cmrh system and its other associated work of unit no. 6 of 2x250 mw ctps, parichha during overhauling of unit 6
Overhauling of cmrh system and its other associated work of unit no. 6 of 2x250 mw ctps, parichha during overhauling of unit 6
Read moreService contract for boiler pressure parts checking cleaning repairing for boiler steaming license renewal of unit no1 and efficiency improvement during the schedule short shut down for boiler license renewal of unit no1 at sgtpp
Service contract for boiler pressure parts checking cleaning repairing for boiler steaming license renewal of unit no1 and efficiency improvement during the schedule short shut down for boiler license renewal of unit no1 at sgtpp
Read moreTtps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot
Read moreTtps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul