Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Cable And Pipe Lines Well No.1 And 4 At Palar Bed At Palar River Bed In Walajabad Town Panchayat
|
| Description |
Providing Cable And Pipe Lines Well No.1 And 4 At Palar Bed At Palar River Bed In Walajabad Town Panchayat
|
| Organisation | Directorate of Town Panchayats | State Govt. and UT |
| Tender Id | 2024_DTP_423013_1 |
|
Reference Number |
169/2023/A1 |
| Tender Fee | 0 |
| EMD | 12070 |
| Tender Value | - |
| Place | walajabad |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=518647 |
| Start Date | March 04, 2024 14:30 |
| End Date |
Expired
15/03/2024
Expired 941 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Purchasing and installating a new pumpset for the filter bed in nalatawad town
Purchasing and installating a new pumpset for the filter bed in nalatawad town
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at filter bed (v) in hanumakonda (m) of hanumakonda town division of operation circle hanumakonda under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at filter bed (v) in hanumakonda (m) of hanumakonda town division of operation circle hanumakonda under t and d/ si scheme on partial turnkey basis.
Read moreLabour charges for the extension of the chatlapur bore well water supply pipe line from kk-3 f/bed to kk-5 f/bed by laying hdpe line along the road at mm township, mandamarri area
Labour charges for the extension of the chatlapur bore well water supply pipe line from kk-3 f/bed to kk-5 f/bed by laying hdpe line along the road at mm township, mandamarri area
Read moreShifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at theegalabanjara (v) in konijerla (m) of khammam town division of operation khammam circle under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at theegalabanjara (v) in konijerla (m) of khammam town division of operation khammam circle under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at madharam (v) in singareni(m) of khammam town division of operation circle khammam under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at madharam (v) in singareni(m) of khammam town division of operation circle khammam under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at parkal town-2 in parkal (m) of hanumakonda rural division of operation circle hanumakonda under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at parkal town-2 in parkal (m) of hanumakonda rural division of operation circle hanumakonda under t and d/ si scheme on partial turnkey basis.
Read moreErection of 33/11kv substation with connected 33kv and 11kv lines at chinthakunta (v) in sirpur town (m) of sirpur kagaznagar division of operation circle asifabad under t and d/ si scheme on partial turnkey basis.
Erection of 33/11kv substation with connected 33kv and 11kv lines at chinthakunta (v) in sirpur town (m) of sirpur kagaznagar division of operation circle asifabad under t and d/ si scheme on partial turnkey basis.
Read moreProposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Read moreRejuvenation of palar river
Evaluation of works executed for rejuvenation of palar river in kancheepuram and chengalpattu districts with the funding assistance from national bank for agriculture and rural development (nabard)
Read moreof your Industry type