Tender Details
Particulars | Details |
---|---|
Title |
Ttps Es Circle Em I Hydrostatic Testing Of 93 Nos Of Hydrogen Gas Cylinders Replacement Of Cylinder Valves And Painting The Cylinders With 2 Coats Of Recommended Colour Paint Inclusive Of Transportation In Respect Of Hydrogen Plant 1 And 2
|
Description |
Ttps Es Circle Em I Hydrostatic Testing Of 93 Nos Of Hydrogen Gas Cylinders Replacement Of Cylinder Valves And Painting The Cylinders With 2 Coats Of Recommended Colour Paint Inclusive Of Transportation In Respect Of Hydrogen Plant 1 And 2
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_523742_1 |
Reference Number |
CE/SE/ES /TTPS /No.287/2024-25 |
Tender Fee | 0 |
EMD | 3800 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=623520 |
Start Date | February 08, 2025 00:00 |
End Date |
24/02/2025 ( Expired 56 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Periodical examination, testing and painting of hydrogen, nitrogen and carbon dioxide gas cylinders and repairing of defective gas cylinders, if any of stpp, jaipur, mancherial , telanagana under rule 35 of gas cylinder rules on value rate contract basis for a period of two years.
Periodical examination, testing and painting of hydrogen, nitrogen and carbon dioxide gas cylinders and repairing of defective gas cylinders, if any of stpp, jaipur, mancherial , telanagana under rule 35 of gas cylinder rules on value rate contract basis for a period of two years.
Read moreTtps es circle em i overhauling of 3 nos leaky electrolytic cells in hydrogen plant ii
Ttps es circle em i overhauling of 3 nos leaky electrolytic cells in hydrogen plant ii
Read moreTtps es circle em ii charges for overhauling of 2 nos 100kva 22kv 433v distribution transformer in ttps site area
Ttps es circle em ii charges for overhauling of 2 nos 100kva 22kv 433v distribution transformer in ttps site area
Read moreHydrostatic stretch testing of hydrogen gas cylinders changing of its damaged or defective parts, painting etc. of hydrogen generation plant
Hydrostatic stretch testing of hydrogen gas cylinders changing of its damaged or defective parts, painting etc. of hydrogen generation plant
Read moreTtps es circle em i charges for load testing of two nos 125 25 t eot cranes no 347 and 348 in unit i ii and iii
Ttps es circle em i charges for load testing of two nos 125 25 t eot cranes no 347 and 348 in unit i ii and iii
Read moreTtps es circle em iii load testing of 4 nos 10 tonne capacity wire rope electric hoists at fd fan and pa fan motor 5a and 5b of unit 5 boiler area
Ttps es circle em iii load testing of 4 nos 10 tonne capacity wire rope electric hoists at fd fan and pa fan motor 5a and 5b of unit 5 boiler area
Read moreTtps es circle em i hydrostatic testing of 93 nos of hydrogen gas cylinders replacement of cylinder valves and painting the cylinders with 2 coats of recommended colour paint inclusive of transportation in respect of hydrogen plant 1 and 2
Ttps es circle em i hydrostatic testing of 93 nos of hydrogen gas cylinders replacement of cylinder valves and painting the cylinders with 2 coats of recommended colour paint inclusive of transportation in respect of hydrogen plant 1 and 2
Read moreTtps es circle em ii annual maintenance contract charges for the maintenance of 2 nos epabx common telephone exchange system having 500 lines available at camp i 2 for the period from 01.04.2025 to 31.03.2026
Ttps es circle em ii annual maintenance contract charges for the maintenance of 2 nos epabx common telephone exchange system having 500 lines available at camp i 2 for the period from 01.04.2025 to 31.03.2026
Read moreNctps i es circle em i dn s dn v gm daily cleaning of generator brush gear assembly shifting of filled hydrogen cylinders from hydrogen plant to unit i ii iii gas feeding room and empty hydrogen cylinders back to hydrogen plant and othe
Nctps i es circle em i dn s dn v gm daily cleaning of generator brush gear assembly shifting of filled hydrogen cylinders from hydrogen plant to unit i ii iii gas feeding room and empty hydrogen cylinders back to hydrogen plant and othe
Read moreNctps i es circle em i division sd v gm hydrogen plant overhauling of 2 nos high pressure water cooled hydrogen gas compressor in hydrogen plant for the year 2024 2025 at nctps i
Nctps i es circle em i division sd v gm hydrogen plant overhauling of 2 nos high pressure water cooled hydrogen gas compressor in hydrogen plant for the year 2024 2025 at nctps i
Read moreof your Industry type