Tender Details
Particulars | Details |
---|---|
Title |
Day To Day R And M Of Joinery Work Of Resi. And Non Resi. Building At Vidhyut Nagar And Shakti Nagar And Their Respective Power House
|
Description |
Day To Day R And M Of Joinery Work Of Resi. And Non Resi. Building At Vidhyut Nagar And Shakti Nagar And Their Respective Power House
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1090 |
EMD | 22320 |
Tender Value | |
Place | BANSWARA |
Link |
AAAAAAAAAA Login to view |
Start Date | April 01, 2025 14:30 |
End Date |
24/04/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Outsourcing maintennace at ph-1 to ph-4 of mukerian hydel project pspcl talwara punjab
Outsourcing the work of routine, prive maintenance, breakdown maintenance and annual overhauling of generating units, switchyards and other allied equipment through contractor at ph 1 to 4 of mukerian hydel project pspcl talwara pb
Read moreConst. of drain from jatav to mukesh khair, shankar mandir to narmada vanshkar, lallu house to maharaj, bhagwati rajput to rakesh rajput and const. of both side drain from setu vanshkar to raja khan in jagdish ward, nagar palika parishad gadarwara
Const. of drain from jatav to mukesh khair, shankar mandir to narmada vanshkar, lallu house to maharaj, bhagwati rajput to rakesh rajput and const. of both side drain from setu vanshkar to raja khan in jagdish ward, nagar palika parishad gadarwara
Read moreConstruction of drain and covering from badeveer neta house to river side, chhattar to khimma jatav, jamman panda to kishan jatav, dhanraj to gendalal, jagdish panda to kallu vanshkar in mata ward, nagar palika parishad, gadarwara
Construction of drain and covering from badeveer neta house to river side, chhattar to khimma jatav, jamman panda to kishan jatav, dhanraj to gendalal, jagdish panda to kallu vanshkar in mata ward, nagar palika parishad, gadarwara
Read moreConstruction of drain from prahlad kushwaha to varma house and kanha kunj to awashthi kirana in niranjan ward, nagar palika parishad, gadarwara
Construction of drain from prahlad kushwaha to varma house and kanha kunj to awashthi kirana in niranjan ward, nagar palika parishad, gadarwara
Read moreConstruction work of rcc culvert and drain to resolve the water logging issue at hanuman chowk.
Construction work of rcc culvert and drain to resolve the water logging issue at hanuman chowk.
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreProviding architectural and engineering design consultancy for the work of construction of mfsdsai building at sahyadri campus, iit palakkad
Providing architectural and engineering design consultancy for the work of construction of mfsdsai building at sahyadri campus, iit palakkad
Read moreWbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreWork of drain covers and street lights at different wards of nagar parishad manpur distt. indore(as per schedule)
Work of drain covers and street lights at different wards of nagar parishad manpur distt. indore(as per schedule)
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreof your Industry type