Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvement Work Of Marked Chola Mod Black Spot Up 8081 In The Year 2024 On Nh 91 Aabadi Part Under Road Safety In Distt. Bulandshahr
|
Description |
Improvement Work Of Marked Chola Mod Black Spot Up 8081 In The Year 2024 On Nh 91 Aabadi Part Under Road Safety In Distt. Bulandshahr
|
Organisation | Cheif Engineer Meerut Zone PWD Meerut | State Govt. and UT |
Tender Id | 2025_CEMRT_992102_1 |
Reference Number |
9190/96M/E-Tender/BSR Circle/2024-25 dt. 26.12.2024 |
Tender Fee | 2714 |
EMD | 9.1 Lakh |
Tender Value | |
Place | Bulandshahr |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1837260 |
Start Date | March 19, 2025 14:30 |
End Date |
25/03/2025 ( Expired 81 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreProviding road safety measures at morth identified black spots locations based on accident data of 2017-19,2018-20 and 2019-21 from km.23.000 (near thukkuguda) to km.108.800 (dindi) of hyderabad -dindi section of nh-765 in the states of telangana
Providing road safety measures at morth identified black spots locations based on accident data of 2017-19,2018-20 and 2019-21 from km.23.000 (near thukkuguda) to km.108.800 (dindi) of hyderabad -dindi section of nh-765 in the states of telangana
Read moreImprovement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreOne time improvement in bhoura town portion, shahpur town portion and padhar town portion on nh 69 (old) nh 46 (new) itarsi betul road in the state of madhya pradesh on epc mode
One time improvement in bhoura town portion, shahpur town portion and padhar town portion on nh 69 (old) nh 46 (new) itarsi betul road in the state of madhya pradesh on epc mode
Read moreSopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25
Sopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25
Read moreof your Industry type