Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Fob In Connection With The Work Extension Of All Lines With Provision Of Pqrs Line Beside Dn Loop Line And Provision Of Up Passenger Platfrom At Ondagram Station.
|
| Description |
Construction Of Fob In Connection With The Work Extension Of All Lines With Provision Of Pqrs Line Beside Dn Loop Line And Provision Of Up Passenger Platfrom At Ondagram Station.
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 12, 2026 19:07 |
| End Date |
Open
03/11/2026
18 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
25kv ohe work in connection with conversion of pit line and passenger stabling line beside dn main line at rph into dn loop -1 & dn loop -2 under howrah division of eastern railway.
25kv ohe work in connection with conversion of pit line and passenger stabling line beside dn main line at rph into dn loop -1 & dn loop -2 under howrah division of eastern railway.
Read moreSignalling work in connection with provision of tws-290 sets in passenger running loop lines over rewari-madar section of jaipur division.
Signalling work in connection with provision of tws-290 sets in passenger running loop lines over rewari-madar section of jaipur division.
Read moreSignalling work in connection with provision of ttr (fs+tws+wcmsc) -155 sets in passenger running loop lines in rewari-madar section of jaipur division.
Signalling work in connection with provision of ttr (fs+tws+wcmsc) -155 sets in passenger running loop lines in rewari-madar section of jaipur division.
Read moreProvision of passenger lifts connecting to fob at abka, ndae, kwae, az & kgle over howrah division.
Provision of passenger lifts connecting to fob at abka, ndae, kwae, az & kgle over howrah division.
Read moreExecution of p way work and construction of bridge in connection with the work of dismantling of up and dn main line cross over at both ends to eliminate dn main cum up loop facility by provision of up loop line and island passenger platform at garbeta (gba) station.
Execution of p way work and construction of bridge in connection with the work of dismantling of up and dn main line cross over at both ends to eliminate dn main cum up loop facility by provision of up loop line and island passenger platform at garbeta (gba) station.
Read moreS&t work for yard modification to enhance cal of short csl lines and a long loop line at dn grid and pathway in station yards at tunia.
S&t work for yard modification to enhance cal of short csl lines and a long loop line at dn grid and pathway in station yards at tunia.
Read moreOhe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division
Ohe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division
Read moreProvision/modification of ohe in connection with (1) chhulha: construction of long loop line (cal-750m, ds-pt) with bi-directional 03rd line by extending de of loop line no.-5 at apr end. (2) aal: extension of de up loopl/7 at kte end with dispatch facilty to 03rd line for long haul formation & goods parking line alongwith pathway & lighting facility. (3) loa- construction of dn long haul loop (cal-1500m) by extending de of existing dn loop line no.-1 at kte end with reception facility
Provision/modification of ohe in connection with (1) chhulha: construction of long loop line (cal-750m, ds-pt) with bi-directional 03rd line by extending de of loop line no.-5 at apr end. (2) aal: extension of de up loopl/7 at kte end with dispatch facilty to 03rd line for long haul formation & goods parking line alongwith pathway & lighting facility. (3) loa- construction of dn long haul loop (cal-1500m) by extending de of existing dn loop line no.-1 at kte end with reception facility
Read moreStrengthening of existing side pathway and replacement of corroded/perforated members like m.s chequered plate by ss antiskid chequred plates of gang way, side pathway, man refuse and tolly refuse of br. no.12 up, 20 up , 51 up, 83 up, 91 dn, 105 dn, 106 dn, 11 dn, 168 a, 169, 171, 171a, 173, 174a, 179, 180a, 215, 217 and 230 in bb loop and provision of new side pathway at br.nos 2,5,6 in nh-bdc section & tpkr fly over of howrah.
Strengthening of existing side pathway and replacement of corroded/perforated members like m.s chequered plate by ss antiskid chequred plates of gang way, side pathway, man refuse and tolly refuse of br. no.12 up, 20 up , 51 up, 83 up, 91 dn, 105 dn, 106 dn, 11 dn, 168 a, 169, 171, 171a, 173, 174a, 179, 180a, 215, 217 and 230 in bb loop and provision of new side pathway at br.nos 2,5,6 in nh-bdc section & tpkr fly over of howrah.
Read moreStrengthening of existing side pathway and replacement of corroded /perforated members like m.s chequered plates by ss antiskid chequered plates of gang way , side pathway ,man refuse and tolly refuse of br. no.-12 up, 20 up, 51 a, 83 up, 91 dn , 105 dn, 106 dn, 119 dn, 168 a, 169 , 171,171a, 173, 174 a, 179, 180 a ,215, 217 and 230 in bb loop and provision of new path at br. nos 2, 5, 6 in nh-bdc section & tpkr fly over of howrah division.
Strengthening of existing side pathway and replacement of corroded /perforated members like m.s chequered plates by ss antiskid chequered plates of gang way , side pathway ,man refuse and tolly refuse of br. no.-12 up, 20 up, 51 a, 83 up, 91 dn , 105 dn, 106 dn, 119 dn, 168 a, 169 , 171,171a, 173, 174 a, 179, 180 a ,215, 217 and 230 in bb loop and provision of new path at br. nos 2, 5, 6 in nh-bdc section & tpkr fly over of howrah division.
Read moreof your Industry type