Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Preparation Of Travelling Roadway Along With Supporting Of Roof By Roof Bolting From 0 Dip From11 L To 44 L And Cleaning And Removal Of Loose Muck, Malma Along Return Roadway From Air Shaft To Panels And Proposed 39 Ln And 34 Ln Lhcm Panel Of Seam A At
|
| Description |
Preparation Of Travelling Roadway Along With Supporting Of Roof By Roof Bolting From 0 Dip From11 L To 44 L And Cleaning And Removal Of Loose Muck, Malma Along Return Roadway From Air Shaft To Panels And Proposed 39 Ln And 34 Ln Lhcm Panel Of Seam A At
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_SECL_292619_1 |
|
Reference Number |
AGM/HSD/GM(O)/e-Tend/23-24/63 dtd 04.11.2023 |
| Tender Fee | - |
| EMD | 46800 |
| Tender Value | - |
| Place | Office of the Area General Manager |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 04, 2023 23:30 |
| End Date |
Expired
16/11/2023
Expired 1029 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of temporary stopping by old reject conveyor belt in 39ln and 34ln lhcm panel (ii) preparation of intermediate sump for proper dewatering. (iii) shifting of pump along with pipe line. (iv) laying of pipe etc. in dep. panel 39ln and 34ln
Erection of temporary stopping by old reject conveyor belt in 39ln and 34ln lhcm panel (ii) preparation of intermediate sump for proper dewatering. (iii) shifting of pump along with pipe line. (iv) laying of pipe etc. in dep. panel 39ln and 34ln
Read moreRoof support by roof bolting along travelling roadway of incline of rvii seam of bankola colliery
Roof support by roof bolting along travelling roadway of incline of rvii seam of bankola colliery
Read moreRoof support by roof bolting along travelling roadway of no.2 incline of rvii seam of bankola colliery.
Roof support by roof bolting along travelling roadway of no.2 incline of rvii seam of bankola colliery.
Read moreRoof support by roof bolting along travelling roadway of sankalpa khani incline of rvii seam of bankola colliery.
Roof support by roof bolting along travelling roadway of sankalpa khani incline of rvii seam of bankola colliery.
Read moreRoof bolting along travelling roadway adjacent galleries east west level at borachak seam at dhemomain incline
Roof bolting along travelling roadway adjacent galleries east west level at borachak seam at dhemomain incline
Read moreRoof bolting along travelling roadway for panel-20 in borachak(r-viii) seam at patmohona colliery
Roof bolting along travelling roadway for panel-20 in borachak(r-viii) seam at patmohona colliery
Read moreRoof support by roof bolting and cleaning along travelling roadway in r-v seam of khottadih colliery, pandaveswar area
Roof support by roof bolting and cleaning along travelling roadway in r-v seam of khottadih colliery, pandaveswar area
Read moreConstruction of miner station, first aid station, fire fighting station, material yard, etc. at 30ln proposed lhcm dep. panels in every 100m progress (ii) cleaning, removal of loose muck, malma along roadway in panels 30ln galleries
Construction of miner station, first aid station, fire fighting station, material yard, etc. at 30ln proposed lhcm dep. panels in every 100m progress (ii) cleaning, removal of loose muck, malma along roadway in panels 30ln galleries
Read moreRoof bolting along 0d haulage roadway to main dip pumping station in sripur (rvi) seam at chapuikhas colliery
Roof bolting along 0d haulage roadway to main dip pumping station in sripur (rvi) seam at chapuikhas colliery
Read more(i) construction of miner station, first aid station, fire fighting station, material yard ,battery station in -27rise and -21rise proposed lhcm dep. panels in every 100m progress (ii) cleaning and removal of loose muck, malma along return roadway
(i) construction of miner station, first aid station, fire fighting station, material yard ,battery station in -27rise and -21rise proposed lhcm dep. panels in every 100m progress (ii) cleaning and removal of loose muck, malma along return roadway
Read moreof your Industry type