Tender Details
Particulars | Details |
---|---|
Title |
(I) Construction Of Miner Station, First Aid Station, Fire Fighting Station, Material Yard ,Battery Station In 27 Rise And 21 Rise Proposed Lhcm Dep. Panels In Every 100 M Progress (Ii) Cleaning And Removal Of Loose Muck, Malma Along Return Roadway
|
Description |
(I) Construction Of Miner Station, First Aid Station, Fire Fighting Station, Material Yard ,Battery Station In 27 Rise And 21 Rise Proposed Lhcm Dep. Panels In Every 100 M Progress (Ii) Cleaning And Removal Of Loose Muck, Malma Along Return Roadway
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_SECL_293044_1 |
Reference Number |
AGM/HSD/GM(O)/e-Tend/23-24/77 dtd 07.11.2023 |
Tender Fee | |
EMD | 1.8 Lakh |
Tender Value | |
Place | Office of the Area General Manager |
Link | https://coalindiatenders.nic.in |
Start Date | November 07, 2023 23:30 |
End Date |
27/11/2023 ( Expired 513 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of miner station, first aid station, fire fighting station, material yard, etc. at 30ln proposed lhcm dep. panels in every 100m progress (ii) cleaning, removal of loose muck, malma along roadway in panels 30ln galleries
Construction of miner station, first aid station, fire fighting station, material yard, etc. at 30ln proposed lhcm dep. panels in every 100m progress (ii) cleaning, removal of loose muck, malma along roadway in panels 30ln galleries
Read moreProposal for construction of miner station, first-aid station, fire-fighting station in proposed dep. panel -39d of seam-c at kurja ug mine
Proposal for construction of miner station, first-aid station, fire-fighting station in proposed dep. panel -39d of seam-c at kurja ug mine
Read more(i) erection of temporary stopping by old reject conveyor belt in -39dip and 28ls lhcm panel (ii) cleaning , removal of malma along travelling roadway of -39dip and 28ls panel (iii) transportation, laying, charging of armored cable from old dist. to
(i) erection of temporary stopping by old reject conveyor belt in -39dip and 28ls lhcm panel (ii) cleaning , removal of malma along travelling roadway of -39dip and 28ls panel (iii) transportation, laying, charging of armored cable from old dist. to
Read more(i) erection of temporary stopping by old reject conveyor belt in -21rise lhcm panel (ii) cleaning and removal of malma along travelling roadway of -21rise panel (iii) transportation, laying, charging of armored cable from old dist. to new dist.
(i) erection of temporary stopping by old reject conveyor belt in -21rise lhcm panel (ii) cleaning and removal of malma along travelling roadway of -21rise panel (iii) transportation, laying, charging of armored cable from old dist. to new dist.
Read moreConstruction of reserve station, miner station, first- aid station, fire fighting station, material yard in working district in every 100m progress of district at baherabandh ug mine of hadeo area
Construction of reserve station, miner station, first- aid station, fire fighting
 station, material yard in working district in every 100m progress of district at baherabandh ug mine of hadeo area
Read moreConstruction of reserve station, miner station, first- aid station, fire fighting station, material yard in working district in every 100m progress of district at baherabandh ug mine of hadeo area.
Construction of reserve station, miner station, first- aid station, fire fighting station, material yard in working district in every 100m progress of district at baherabandh ug mine of hadeo area.
Read moreI) erection of temporary stopping by old reject conveyor belt in 30ln lhcm panel (ii) cleaning and removal of malma along roadway of 30ln panel (iii) transportation, laying charging of armoured cable from old disst. to new disst.
I) erection of temporary stopping by old reject conveyor belt in 30ln lhcm panel (ii) cleaning and removal of malma along roadway of 30ln panel (iii) transportation, laying charging of armoured cable from old disst. to new disst.
Read more(i) erection of temporary stopping by old reject conveyor belt in 30ls lhcm panel (ii) cleaning and removal of malma along roadway of 30ls panel (iii) transportation, laying, charging of armoured cable from old disst. to new disst.
(i) erection of temporary stopping by old reject conveyor belt in 30ls lhcm panel (ii) cleaning and removal of malma along roadway of 30ls panel (iii) transportation, laying, charging of armoured cable from old disst. to new disst.
Read moreRoof and side dressing and stacking the dressed materials up to a distance 50m along belt roadway, haulage,/trav. roadway, roadway of -21rise proposed lhcm dep. panel in seam c at kurja sheetaldhara ug mine.
Roof and side dressing and stacking the dressed materials up to a distance 50m along belt roadway, haulage,/trav. roadway, roadway of -21rise proposed lhcm dep. panel in seam c at kurja sheetaldhara ug mine.
Read more(i) construction of miner station, first aid station, fire fighting station, material yard ,battery station in -27rise and -21rise proposed lhcm dep. panels in every 100m progress (ii) cleaning and removal of loose muck, malma along return roadway
(i) construction of miner station, first aid station, fire fighting station, material yard ,battery station in -27rise and -21rise proposed lhcm dep. panels in every 100m progress (ii) cleaning and removal of loose muck, malma along return roadway
Read moreof your Industry type